Canonical workflow for the 21 engineering agents. This is a guide, not a rigid gate. Simple changes can skip phases; complex features should follow them in order. Each phase has an owner, inputs, outputs, and an exit criterion.

The 6 phases

Discovery → Planning → Solutioning → Build → Verify → Retro

Phase 1 — Discovery

Owner: @echo-analyst Also involved: @scout-explorer (parallel codebase facts), @trail-tracer (causal investigation when symptom → cause is unclear) Inputs: vague user request, problem statement, or bug report Outputs: [C]discovery-{feature}.md in the feature folder — surfaces gaps, unstated assumptions, hidden constraints, open questions Exit criterion: list of open questions answered or explicitly deferred; problem space is crisp enough that a PRD can be written.

Skip when: the request is already crisp and scoped (e.g., "add timeout param with default 5000ms").

Phase 2 — Planning

Owner: @compass-planner Also involved: @nova-product (business-layer PM) when the feature has external stakeholders or user-facing trade-offs Inputs: discovery output (or direct request for small tasks) Outputs:

  1. [C]prd-{feature}.md — Product Requirements Document (what and why; acceptance criteria in Given/When/Then)
  2. [C]plan-{feature}.md — 3-6 step executable plan (how; derived from the PRD)

Exit criterion: user explicit approval on the plan. No implementation begins without it.

Skip when: trivial changes where a PRD adds no value — go direct to a minimal plan.

Phase 3 — Solutioning

Owner: @apex-architect Also involved: @raven-critic (adversarial review for high-stakes decisions), @scroll-docs (external SDK/API lookups), @vault-security (security implications of the design) Inputs: PRD + plan Outputs: [C]architecture-{feature}.md in ADR format — Decision, Drivers, Alternatives, Consequences, Follow-ups Exit criterion: architectural decisions documented and (for high-stakes) critiqued by Raven.

Skip when: change fits cleanly into existing patterns with no new decisions to make.

Phase 4 — Build

Owner: @bolt-executor Also involved: @grid-tester (TDD when tests come first), @canvas-designer (UI/UX work), @hawk-debugger (when bugs surface), @flow-git (atomic commits) Inputs: plan + architecture (if any) Outputs: working code + tests + commits Exit criterion: all plan steps implemented, tests green, self-verification passed.

Circuit breaker: 3 failed attempts on the same issue → Bolt escalates to @apex-architect (do not try variation #4).

Phase 5 — Verify

Owner: @oath-verifier Also involved: @lens-reviewer (2-stage code review: spec compliance + quality), @probe-qa (interactive end-to-end testing), @vault-security (security audit on security-sensitive changes) Inputs: build output + original PRD/plan (for spec compliance check) Outputs: [C]verification-{feature}.md — evidence-based PASS/FAIL/INCOMPLETE with fresh test runs, build status, and acceptance criteria coverage Exit criterion: all acceptance criteria from the PRD are mapped to evidence. No "should work" — actual output.

Never skipped for non-trivial changes.

Phase 6 — Retro

Owner: @mirror-retro Inputs: all artifacts from phases 1-5 in the feature folder Outputs: [C]retro-{feature}.md — what worked, what didn't, patterns to reuse, patterns to avoid, memory updates to propose Exit criterion: retro saved; proposed memory updates reviewed by user; closed feedback loop.

Skip when: change was tiny and there are no lessons to extract.


Cycle orchestration

The @helm-conductor agent sits above these phases. Its job is not to do the work of any phase, but to answer:

  • "What's the next thing to work on?"
  • "Which feature is blocked and why?"
  • "Who should I call for this task?"
  • "Are we respecting dependencies between features?"

Call @helm-conductor when you have multiple active features or are unsure which phase a task is in.


Feature folders — the unit of work

Every non-trivial piece of work lives in its own feature folder:

workspace/development/features/{feature-slug}/
├── [C]discovery-{feature}.md       ← Phase 1 (Echo)
├── [C]prd-{feature}.md             ← Phase 2 (Compass)
├── [C]plan-{feature}.md            ← Phase 2 (Compass)
├── [C]architecture-{feature}.md    ← Phase 3 (Apex, ADR format)
├── [C]code-review-{feature}.md     ← Phase 5 (Lens)
├── [C]verification-{feature}.md    ← Phase 5 (Oath)
└── [C]retro-{feature}.md           ← Phase 6 (Mirror)

Slug convention: {kebab-case-name} — e.g., dark-mode, pg15-migration, auth-refactor.

Why feature folders in addition to workspace/development/{type}/:

  • Feature folders give coherent context — one place to find everything about a feature
  • Type folders (plans/, reviews/, etc.) are still useful for cross-feature views and remain the canonical location for standalone artifacts (one-off debug sessions, global audits, etc.)

Rule of thumb:

  • Feature folder when the work spans 2+ phases and has a clear name ("dark mode", "pg15 migration")
  • Type folder when the work is a one-off (a single plan, a standalone review, an ad-hoc debug) or spans no specific feature

Inherited Context — how agents read prior artifacts

Before starting work, every engineering agent should check for prior artifacts in the active feature folder:

  1. Is there a feature folder for this work? Look for workspace/development/features/{slug}/
  2. If yes, read in order: discovery → PRD → plan → architecture → any prior reviews/verifications
  3. Inherit constraints, decisions, and open questions — don't re-litigate them
  4. If unclear which feature this is, ask the user or call @helm-conductor

This is how EvoNexus avoids each agent being an island: context flows forward through the feature folder.


Handoff protocol

When one agent hands off to another, the handoff includes:

  • Source artifact: path to the file produced (PRD, plan, architecture, etc.)
  • What was done: 1-2 sentences
  • What's open: unresolved questions or decisions deferred
  • Expected output: what the next agent should produce and where

Example handoff:

"Compass → Bolt: plan saved to workspace/development/features/dark-mode/[C]plan-dark-mode.md. Architecture pending (Apex). Open question: token storage strategy (see plan §Open Questions). Expected: implementation against steps 1-5 + self-verification."


When to skip phases

Not every change deserves all 6 phases. Use judgment:

Change typePhases to use
Typo, comment fix, renameBuild only
Small bug fix with clear reproBuild → Verify
Feature with clear acceptance criteriaPlanning → Build → Verify
New feature with ambiguityDiscovery → Planning → Build → Verify
High-stakes architectural changeAll 6 phases
Post-incident fixDiscovery (trail-tracer) → Build → Verify → Retro

Default: when in doubt, ask @helm-conductor or @compass-planner which phases apply.