Backup_Recovery_Policy.md

May 24, 2026 Β· View on GitHub

Hack23 Logo

πŸ’Ύ Hack23 AB β€” Backup & Recovery Policy

πŸ›‘οΈ Business Impact-Driven Data Protection Framework
🎯 Systematic Backup Strategy Aligned with Business Continuity Requirements

Owner Version Effective Date Review Cycle

πŸ“‹ Document Owner: CEO | πŸ“„ Version: 1.2 | πŸ“… Last Updated: 2026-01-25 (UTC)
πŸ”„ Review Cycle: Semi-Annual | ⏰ Next Review: 2026-07-25


🎯 Purpose Statement

🏒 Hack23 AB's backup and recovery policy demonstrates how πŸ”§ systematic data protection directly enables both operational resilience and competitive advantage. Our πŸ“Š business impact-driven backup strategy serves as both operational necessity and πŸ‘₯ client demonstration of our cybersecurity consulting methodologies.

This policy establishes mandatory backup requirements based on 🏷️ Classification Framework business impact analysis, ensuring data protection aligns with business value and continuity objectives.

β€” πŸ‘¨β€πŸ’Ό James Pether SΓΆrling, CEO/Founder


πŸ“Š Business Impact-Driven Backup Framework

🎯 Business Impact Analysis Integration

Our backup strategy is directly driven by business impact assessment from the 🏷️ Classification Framework, ensuring resource allocation matches business value and regulatory requirements:

%%{
  init: {
    'theme': 'base',
    'themeVariables': {
      'primaryColor': '#4CAF50',
      'primaryTextColor': '#2e7d32',
      'lineColor': '#4CAF50',
      'secondaryColor': '#1565C0',
      'tertiaryColor': '#FF9800'
    }
  }
}%%
graph TD
    subgraph BIA["πŸ“Š Business Impact Analysis"]
        FIN["πŸ’° Financial Impact<br/>Revenue & Cost Impact"]
        OPS["βš™οΈ Operational Impact<br/>Service Disruption"]
        REP["🀝 Reputational Impact<br/>Trust & Brand"]
        REG["βš–οΈ Regulatory Impact<br/>Compliance Risk"]
    end
    
    subgraph BACKUP["πŸ’Ύ Backup Requirements"]
        CRITICAL["πŸ”΄ Critical Backup<br/>Real-time/Continuous"]
        HIGH["🟠 High Priority<br/>Hourly/Daily"]
        MEDIUM["🟑 Medium Priority<br/>Daily/Weekly"]
        STANDARD["🟒 Standard Backup<br/>Weekly/Monthly"]
    end
    
    subgraph BUSINESS["🏒 Business Functions"]
        CORE["πŸ—οΈ Core Operations<br/>Revenue Generation"]
        FINANCE["πŸ’° Financial Systems<br/>Compliance Critical"]
        SUPPORT["πŸ› οΈ Support Functions<br/>Business Enablement"]
        ADMIN["πŸ“‹ Administrative<br/>Record Keeping"]
    end
    
    FIN -->|Very High/Critical| CRITICAL
    OPS -->|Critical| CRITICAL
    REG -->|Critical| CRITICAL
    
    FIN -->|High/Moderate| HIGH
    OPS -->|High| HIGH
    REP -->|High/Moderate| HIGH
    REG -->|High| HIGH
    
    FIN -->|Moderate/Low| MEDIUM
    OPS -->|Moderate| MEDIUM
    REP -->|Moderate/Low| MEDIUM
    
    REP -->|Low/Negligible| STANDARD
    REG -->|Low/Negligible| STANDARD
    
    CRITICAL --> CORE
    CRITICAL --> FINANCE
    HIGH --> CORE
    HIGH --> FINANCE
    MEDIUM --> SUPPORT
    STANDARD --> ADMIN
    
    style BIA fill:#1565C0
    style BACKUP fill:#FF9800
    style BUSINESS fill:#4CAF50

πŸ“ˆ Business Impact-Based Backup Matrix

Business FunctionπŸ’° Financial Impactβš™οΈ Operational Impact🀝 Reputational Impactβš–οΈ Regulatory ImpactπŸ’Ύ Backup Priority⏰ RTO TargetπŸ”„ RPO Target
πŸ—οΈ Core OperationsHighCriticalHighHighπŸ”΄ Critical< 1 hour< 15 minutes
πŸ’° Financial SystemsVery HighHighModerateCriticalπŸ”΄ Critical< 1 hour< 15 minutes
πŸ”§ Support FunctionsModerateHighModerateModerate🟠 High1-4 hours1-4 hours
πŸ“‹ AdministrativeLowLowLowModerate🟑 Medium4-24 hours4-24 hours
πŸ“’ MarketingLowLowModerateNegligible🟒 Standard> 24 hours> 24 hours

🎯 Backup Requirements by Business Function

πŸ”΄ Critical Business Functions

Business Impact Criteria: Critical functions require immediate backup and recovery capabilities due to:

  • Financial Very High Daily revenue loss potential
  • Operational Critical Complete service disruption
  • Regulatory Critical Compliance violations

Mandatory Requirements:

  • Backup Frequency: Continuous replication or maximum 15-minute intervals
  • Recovery Time: RTO Critical
  • Data Loss: RPO Near Real-time
  • Storage: Multi-region with immutable backup capabilities
  • Validation: Real-time integrity verification
  • Testing: Monthly full recovery validation

🟠 High Priority Business Functions

Business Impact Criteria: High-priority functions require robust backup due to:

  • Financial High Significant daily revenue impact
  • Operational High Major service degradation
  • Regulatory High Significant regulatory penalties

Standard Requirements:

  • Backup Frequency: Hourly or maximum 4-hour intervals
  • Recovery Time: RTO High
  • Data Loss: RPO Hourly
  • Storage: Cross-region with encryption
  • Validation: Daily automated testing
  • Testing: Quarterly recovery drills

🟑 Medium Priority Business Functions

Business Impact Criteria: Medium-priority functions have moderate backup requirements:

  • Financial Moderate Moderate financial impact
  • Operational Moderate Partial operational impact
  • Regulatory Moderate Minor regulatory implications

Standard Requirements:

  • Backup Frequency: Daily backups
  • Recovery Time: RTO Medium
  • Data Loss: RPO Daily
  • Storage: Single region with versioning
  • Validation: Weekly integrity verification
  • Testing: Semi-annual recovery validation

🟒 Standard Business Functions

Business Impact Criteria: Standard functions have basic backup needs:

  • Financial Low Minimal financial impact
  • Operational Low Minor operational disruption
  • Regulatory Low Minimal regulatory risk

Minimum Requirements:

  • Backup Frequency: Weekly or as operationally needed
  • Recovery Time: RTO Standard
  • Data Loss: RPO Extended
  • Storage: Standard backup with basic retention
  • Validation: Monthly spot verification
  • Testing: Annual recovery validation

πŸ”§ Technical Implementation Requirements

πŸ’° Financial Systems Implementation

Process Classification: Finance

Technical Requirements: Reference SUPPLIER.md for detailed supplier backup capabilities and SLA requirements.

System CategoryTechnical ImplementationRecovery MethodCompliance Notes
Banking PlatformProvider real-time backup + immutable storageProvider managed failover + manual proceduresPCI DSS, audit trail requirements
Accounting SystemDaily automated export + provider backupData import + manual reconciliationTax authority, audit requirements
Payment GatewayProvider managed + transaction loggingProvider PCI compliance proceduresPCI DSS Level 1 requirements

πŸ”§ Operations & Technology Implementation

Process Classification: Operations

Technical Requirements: Reference Asset Register for complete infrastructure inventory and dependencies.

System CategoryTechnical ImplementationRecovery MethodDocumentation
Cloud InfrastructureMulti-region snapshots + automated backupsInfrastructure as Code restorationBusiness Continuity Plan
Development PlatformGit repositories + local mirrorsGit restore + CI/CD rebuildSecure Development Policy
CI/CD PipelineConfiguration as code + artifact storageAutomated deployment restorationPipeline documentation

πŸ“’ Marketing & Communications Implementation

Process Classification: Marketing

Technical Requirements: Reference SUPPLIER.md for marketing platform backup capabilities and data export procedures.

System CategoryTechnical ImplementationRecovery MethodAlternative Options
Content AssetsWeekly platform export + version controlManual import + reconstructionMultiple platform strategy
Social Media PlatformsPlatform-native backup + screenshot archiveManual account recreationAlternative platforms available
Marketing ToolsConfiguration export + process documentationManual setup + alternative toolsVendor diversity approach

πŸ“Š Backup Performance and Monitoring

🎯 Key Performance Indicators

Metric CategoryKPITargetMeasurement MethodEscalation Threshold
Backup SuccessCompletion Rate99.9%Automated monitoring<99% for 2 consecutive days
Recovery TimeRTO Achievement95% within targetTest results tracking<90% achievement rate
Data IntegrityVerification Success100%Automated validationAny integrity failure
Storage EfficiencyDeduplication Ratio>70%Storage analytics<60% efficiency

🚨 Monitoring and Alerting

Real-time Monitoring Requirements:

  • Backup job completion status
  • Storage capacity utilization
  • Data integrity verification results
  • Recovery test performance
  • Cross-region replication status

Alert Escalation Matrix:

SeverityResponse TimeNotification MethodResponsible Party
CriticalImmediateSMS + Email + SlackCEO
High15 minutesEmail + SlackCEO
Medium1 hourEmailCEO
Low4 hoursEmail digestCEO

πŸ§ͺ Testing and Validation Framework

πŸ“… Recovery Testing Schedule

Based on business impact classification from Classification Framework:

Business Impact LevelTest FrequencyTest ScopeSuccess CriteriaDocumentation Required
πŸ”΄ CriticalMonthlyFull system recovery100% RTO/RPO complianceComplete test report
🟠 HighQuarterlyComponent recovery95% RTO/RPO complianceTest summary
🟑 MediumSemi-annualData integrity validation90% data verificationTest checklist
🟒 StandardAnnualSpot check recovery80% successful restorationBasic test log

πŸ“Š Testing Methodology

Test Types and Procedures:

  1. Restore Testing: Full data restoration verification
  2. Recovery Time Testing: RTO/RPO measurement validation
  3. Integrity Testing: Data corruption detection and correction
  4. Failover Testing: Backup system activation procedures
  5. Process Testing: Manual procedure verification

πŸ”„ Integration with Business Continuity

πŸ“‹ BCP Integration Points

This policy directly supports Business Continuity Plan recovery objectives:

Business FunctionBCP PriorityBackup StrategySuccess MetricsIntegration Points
πŸ—οΈ Core OperationsCriticalReal-time replication99.9% RTO achievementAutomatic failover procedures
πŸ’° Financial SystemsCriticalImmutable + cross-region100% regulatory complianceManual failover procedures
πŸ”§ Support FunctionsHighDaily + validation95% RTO achievementStandard recovery procedures
πŸ“‹ AdministrativeMediumWeekly + verification90% RTO achievementBest-effort recovery

🚨 Escalation Integration

Reference Business Continuity Plan for complete escalation procedures and Risk Register for risk treatment alignment.

Backup Failure Escalation Matrix:

  • Critical Systems: Immediate BCP activation
  • High Priority: Urgent response procedures
  • Standard Systems: Normal incident response

πŸ” Strategic & Governance

πŸ”„ Business Continuity Framework

βš™οΈ Operational Integration


πŸ“‹ Document Control:
βœ… Approved by: James Pether SΓΆrling, CEO
πŸ“€ Distribution: Public
🏷️ Classification: Confidentiality: Public
πŸ“… Effective Date: 2026-01-25
⏰ Next Review: 2026-07-25
🎯 Framework Compliance: ISO 27001 NIST CSF 2.0 CIS Controls