π οΈ Implementation Feasibility Template
π Can the Policy Actually Be Delivered β By When, At What Cost, With What Risks?
π― Legal Β· Administrative Β· Technical Β· Fiscal Β· Workforce Β· Timeline
π Document Owner: CEO | π Version: 1.2 | π Last Updated: 2026-04-25 (UTC) π’ Owner: Hack23 AB (Org.nr 5595347807) | π·οΈ Classification: Public
π Template instructions: Produce this document on every run. If the current bill has concrete delivery obligations (budget line, infrastructure, IT system, procurement, workforce change), assess that bill directly; otherwise, use this template to audit implementation feasibility for the relevant delivery backlog or previously announced measures. Save as
analysis/daily/${ARTICLE_DATE}/${DOC_TYPE}/implementation-feasibility.md.
β¨ What to produce: A structured feasibility review across six delivery dimensions (Legal, Administrative, Technical, Fiscal, Workforce, Timeline) with evidence and a calibrated overall-feasibility verdict (READY / FEASIBLE / CONSTRAINED / HIGH-RISK / UNLIKELY).
π Template Contract β every fill of this template MUST satisfy this row.
Slot Value Owning methodology per-artifact-methodologies.mdOwning gate check Check 8 (Family D) + Check 9b (Statskontoret evidence) β see 05-analysis-gate.mdRequired inputs Statskontoret index, agency capacity, risk-assessment.mdHorizon band mixed (T+30β¦T+365) (per scripts/horizon-context.ts)Output family Family D β Electoral & Domain Aggregation order 20 of 30 in canonical order (see scripts/render-lib/aggregator/order.ts)Reader Intelligence Guide row generated from implementation-feasibility.md(seescripts/render-lib/aggregator/reader-guide.ts)Canonical evidence anchor | claim | evidence (dok_id / vote / MP intressent_id / primary-source URL) | retrieved_at | confidence |β every analytical claim row uses this schema.Cross-reference:
README.md Β§Template β Methodology β Gate-Check Matrix.
π Tradecraft Context
| Element | Value |
|---|---|
| F3EAD Stage | ANALYZE β delivery risk assessment |
| PIRs Served | PIR-5 (Fiscal Trajectory β budget feasibility), PIR-7 (Democratic Norms β accountability for delivery) |
| Admiralty Floor | Ministry statements require [B2]; budget figures require [A1] (official appropriation documents) |
| WEP + ODNI | Delivery-risk scenarios use WEP (likely/unlikely for on-time delivery); confidence MODERATE (ministries rarely disclose implementation challenges publicly) |
| Source Diversity Floor | P1 (delivery-risk claims): β₯3 sources (budget dok_id + ministry statement + expert assessment); avoid single-ministry-spokesperson claims |
| SAT(s) Applied | Premortem Analysis (assume failure and explain why), Key Assumptions Check (delivery assumptions) |
| ICD 203 Standards | 2 (uncertainties β delivery risks), 5 (customer relevance β implementation milestones), 6 (logical argumentation) |
π Feasibility Context
| Field | Value |
|---|---|
| Feasibility ID | FEA-YYYY-MM-DD-NNN |
| Generated | YYYY-MM-DD HH:MM UTC |
| Subject measure | dok_id and short title |
| Responsible ministry / agency | e.g., Finansdepartementet + Skatteverket |
| Statskontoret relevance | Relevant report/page URL or "none found" |
| Declared start date | YYYY-MM-DD |
| Declared completion date | YYYY-MM-DD |
| Budget envelope | SEK X.Y billion |
| Overall verdict | π’ READY / π’ FEASIBLE / π‘ CONSTRAINED / π HIGH-RISK / π΄ UNLIKELY |
π§ Feasibility Overview
Rendering note: Mermaid 11 core does not ship the
radardiagram type. The canonical fallback below is agraph LR"spoke" chart that conveys the same per-dimension score (1β5) and colour-codes each spoke by traffic-light status. Restore aradarvariant only once the renderer enables the plugin and the validator (npm run validate:mermaid) accepts it.
graph LR
D1["βοΈ Legal<br/>4/5"] --- OUT["π·οΈ Overall<br/>π‘ CONSTRAINED"]
D2["ποΈ Administrative<br/>3/5"] --- OUT
D3["π₯οΈ Technical<br/>4/5"] --- OUT
D4["π° Fiscal<br/>3/5"] --- OUT
D5["π· Workforce<br/>2/5"] --- OUT
D6["ποΈ Timeline<br/>3/5"] --- OUT
style D1 fill:#4CAF50,color:#FFFFFF
style D2 fill:#FFC107,color:#000000
style D3 fill:#4CAF50,color:#FFFFFF
style D4 fill:#FFC107,color:#000000
style D5 fill:#D32F2F,color:#FFFFFF
style D6 fill:#FFC107,color:#000000
style OUT fill:#FF9800,color:#FFFFFF
π Dimension-by-Dimension Review
βοΈ Legal feasibility β 4/5
| Check | Status | Evidence |
|---|---|---|
| Constitutional authority (Regeringsformen) | π’ | Within budgetary prerogative |
| EU compatibility | π‘ | State-aid risk flagged; notification path open |
| Secondary-law impact | π’ | Skattelag amendment required, scheduled |
| Litigation exposure | π’ | Low |
ποΈ Administrative feasibility β 3/5
Statskontoret overlay: administrative-capacity, coordination, backlog, regulatory-burden and efficiency claims should cite Statskontoret first when a relevant public report/page exists. Record URL, report title, publication date, retrieval time and Admiralty grade in
data-download-manifest.md.
| Check | Status | Evidence |
|---|---|---|
| Responsible agency capacity (Skatteverket) | π‘ | Prior surcharge adjustment completed in 4 months; validate against relevant Statskontoret report/page where available |
| Inter-agency coordination (SCB, Tullverket) | π’ | Precedent exists |
| Guidance-document turnaround | π‘ | Normal 90-day cycle |
| Reporting / auditing | π’ | Standard reports available |
π₯οΈ Technical feasibility β 4/5
| Check | Status | Evidence |
|---|---|---|
| IT systems change (Skatteverket) | π’ | Tax-rate parameter update |
| Fuel-monitoring system integration | π’ | Petrol-station price reporting already in place |
| Data pipeline / reporting | π’ | Existing telemetry |
| Cyber-risk exposure | π‘ | Standard elevated-attention review |
π° Fiscal feasibility β 3/5
| Check | Status | Evidence |
|---|---|---|
| Budget envelope sufficient | π‘ | SEK 2.8 B annualised vs. estimated SEK 2.4 B |
| Revenue offset identified | π | Not explicitly earmarked |
| Debt-ceiling impact | π’ | Within surplus-target tolerance |
| Future-year commitments | π‘ | Sunset clause at 12 months but renewal risk |
π· Workforce feasibility β 2/5
| Check | Status | Evidence |
|---|---|---|
| Staff available at Skatteverket | π | Existing hiring freeze |
| Skill mix (policy + IT + call-centre) | π | Call-centre surge capacity limited |
| Contractor routes | π‘ | Ramavtal (framework agreements) available but slow |
| Training needs | π’ | Minimal |
ποΈ Timeline feasibility β 3/5
gantt
title HD03236 Implementation Timeline
dateFormat YYYY-MM-DD
section Legal
FiU committee process :done, l1, 2026-04-15, 2026-04-21
Chamber vote :active, l2, 2026-04-22, 3d
SFS publication : l3, after l2, 5d
section Administrative
Skatteverket guidance : a1, 2026-05-01, 30d
Call-centre scaling : a2, 2026-05-15, 45d
section Technical
IT parameter update : t1, 2026-05-10, 10d
Price-reporting update : t2, 2026-05-20, 14d
section Effect
Pump-price drop visible :milestone, pe, 2026-07-15, 0d
π¦ Critical Dependencies
| # | Dependency | Owner | Risk if missed |
|---|---|---|---|
| D1 | Chamber vote passes by 2026-04-24 | Kammaren | Entire package delayed |
| D2 | SFS publication within 5 days post-vote | Regeringskansliet | Delays IT update |
| D3 | Skatteverket IT parameter change | Skatteverket | Implementation date slips |
| D4 | Call-centre staffing | Skatteverket HR | Citizen complaints surge |
| D5 | EU-Commission non-intervention | Commission | Formal review forces 6-12 m delay |
π§― Risk Register (feasibility-specific)
| # | Risk | L | I | Score | Mitigation |
|---|---|---|---|---|---|
| FR-1 | EU state-aid review opens before SFS | 3 | 5 | 15 | Pre-notify Commission now |
| FR-2 | Call-centre capacity overwhelmed | 4 | 3 | 12 | Activate framework contract |
| FR-3 | Price-reporting integrity issues | 2 | 4 | 8 | Independent pump-price audit |
| FR-4 | Revenue-offset gap breaks surplus target | 3 | 4 | 12 | Identify offset before Q3 budget |
| FR-5 | Workforce gap at Skatteverket | 4 | 3 | 12 | Emergency hiring authorisation |
π Comparable Delivery Benchmarks
| Comparable measure | Delivery time | Outcome |
|---|---|---|
| 2022 Electricity-price support | 6 months to first payment | Delivered but with CRM overload |
| 2019 Reduced VAT on e-books | 5 months | On-time, minimal issues |
| Norway StrΓΈmstΓΈtte 2023 | 3 months | Delivered with price-cap simplification |
β Verdict and Preconditions
Overall: π‘ CONSTRAINED β deliverable by declared date only if D1, D3, D4 land on schedule and EU Commission does not intervene.
| Precondition | Status | Action required |
|---|---|---|
| EU pre-notification submitted | π΄ Not done | Open dialogue this week |
| Call-centre surge contract triggered | π΄ Not done | Authorise by 2026-05-01 |
| Revenue-offset identified | π΄ Not done | Include in Q3 budget bill |
π Links
| Link | Path |
|---|---|
| Risk register | risk-assessment.md |
| Scenario analysis | scenario-analysis.md |
| Comparative international | comparative-international.md |
| Per-document analysis | documents/HD03236-analysis.md |
Document Control
- Template path:
/analysis/templates/implementation-feasibility.md - Referenced by: ai-driven-analysis-guide.md Β§ Step 5
- Classification: Public
- Next Review: 2026-07-21
β Pass-2 Self-Audit Checklist (v4.4 β required)
Purpose: AI-FIRST principle requires a Pass-2 read-back-and-improve. After producing this artifact in Pass 1, re-read it end-to-end and verify each item below. Document any remediation in
methodology-reflection.mdΒ§"Pass-2 audit log". Any unchecked β box at the end of Pass 2 forces a Pass-3 rewrite of the affected section.
- Tradecraft anchors honoured β F3EAD stage matches the artifact's role; PIRs declared in the Β§Tradecraft Context block are actually addressed in the body; Admiralty grades attached to every external source; WEP band + ODNI confidence on every probabilistic judgement.
- Source diversity floor met β at least the minimum number of independent MCP sources required by the artifact's tradecraft block are cited; single-source claims are explicitly labelled
[SINGLE-SOURCE β corroboration pending]. - Evidence specificity β every quantified claim cites a
dok_id(Riksdag), an SCB / IMF dataflow code, or a named external source with date; no "according to data" / "studies show" hand-waves. - Named-actor discipline β every political claim names β₯ 1 person (party + role + dated act/quote) or labels the absence (
[diffuse β no named actor]). - Counter-narrative present β at least one explicit competing hypothesis, dissent quote, or framed objection appears in the body; "no opposition recorded" is itself a finding to label, not silence.
- Election 2026 lens applied β the Β§"Election 2026 Implications" subsection (or equivalent) addresses electoral salience, coalition pressure, and forward indicators; not boilerplate.
- No illustrative content shipped as fact β every
[REQUIRED]placeholder is filled OR removed; everyExample:block is clearly fenced or removed; no fabricateddok_id, vote count, or quote leaks into the final artifact. - Cross-references resolve β every
[link](file.md)in this artifact points to a file that exists in the run folder (analysis/daily/$ARTICLE_DATE/$SUBFOLDER/) or to a methodology / template underanalysis/. - Mermaid renders β every fenced
```mermaidblock parses (no missing class definitions, no orphan nodes, no >40-node graphs that overflow viewport on mobile). - Line-floor check β artifact length β₯ the per-artifact floor in
reference-quality-thresholds.json; shorter artifacts trigger Pass-2 rewrite, never a[truncated]note.