Production Deployment Preparation and Execution
Mission Code: DEPLOY
Estimated Duration: 1-2 hours
Complexity: Medium
Squad Required: Operator, Tester, Developer
ORIENTATION PROTOCOL โ MAP FIRST, READ NARROWLY
Orientation is the expensive step, not the edit. On a large repo the bottleneck is finding what to change, not changing it, and the tokens spent reading files that turned out to be irrelevant are the largest avoidable cost in a session. These four rules are requirements, not preferences.
- Glob/Grep to locate before you Read. Find the path and the line number first:
Globfor file paths,Grepfor symbols, strings and call sites. Do not open a file to discover what is in it. - Read only the lines you need. Use
offsetandlimiton Read. A 40-line window around a confirmed match beats a 900-line whole-file read. - Never read a whole file to find one symbol. Grep for the symbol, then read its neighbourhood. Read a file end to end only when you are about to change it end to end.
- Do not re-read what you have already read. Every re-read re-pays the whole file as input tokens and crowds out the context you still need.
If you read a whole file, be able to state why a narrower read would not have worked.
Mission Briefing
Execute a safe, systematic production deployment with proper validation, monitoring, and rollback procedures. This mission ensures your code reaches users reliably with minimal risk.
MCP Tools
Tools defer-load. The operator discovers what's needed via Tool Search:
tool_search_tool_regex_20251119(pattern="mcp__railway")
tool_search_tool_regex_20251119(pattern="mcp__netlify")
Profile switching is retired in v6.0.
Required Inputs
- Tested Codebase (required) - Code that has passed all tests
- Deployment Configuration (optional) - Environment configs, secrets
- Release Notes (optional) - User-facing change documentation
Mission Phases
Phase 1: Pre-Deployment Validation (15-20 minutes)
Lead: @tester
Objective: Ensure deployment readiness
Tasks:
- Run complete test suite and validate all tests pass
- Verify build process completes successfully
- Check environment configuration and secrets
- Validate database migrations (if applicable)
- Review deployment checklist
Success Criteria:
- All tests passing
- Build artifacts generated successfully
- Environment variables configured
- Migration scripts validated
Phase 2: Deployment Planning (20-30 minutes)
Lead: @operator
Objective: Plan deployment strategy and rollback procedures
Tasks:
- Review deployment target (staging โ production)
- Plan deployment windows and user communication
- Prepare rollback procedures and scripts
- Set up monitoring and health checks
- Configure deployment pipeline
Success Criteria:
- Deployment strategy documented
- Rollback procedures ready
- Monitoring configured
- Pipeline ready for execution
Phase 3: Staging Deployment (15-25 minutes)
Lead: @operator
Support: @developer, @tester
Objective: Deploy to staging for final validation
Tasks:
- Deploy to staging environment
- Run smoke tests on staging
- Validate all features working correctly
- Check performance and error rates
- Verify integrations and external services
Success Criteria:
- Staging deployment successful
- All smoke tests passing
- Performance metrics within acceptable range
- No critical errors detected
Phase 4: Production Deployment (20-30 minutes)
Lead: @operator
Support: @developer, @tester
Objective: Execute production deployment
Tasks:
- Deploy to production environment
- Monitor deployment process and metrics
- Run immediate health checks
- Validate critical user flows
- Monitor error rates and performance
Success Criteria:
- Production deployment successful
- Health checks passing
- Critical flows working
- Error rates normal
Phase 5: Post-Deployment Monitoring (10-15 minutes)
Lead: @operator
Support: @analyst
Objective: Ensure deployment stability
Tasks:
- Monitor application performance
- Track user error reports
- Validate monitoring and alerting
- Document deployment outcomes
- Communicate deployment success
Success Criteria:
- Performance metrics stable
- No increase in error rates
- Monitoring systems active
- Team notified of successful deployment
Common Variations
Hotfix Deployment
- Duration: 30-45 minutes
- Focus: Rapid deployment with minimal testing
- Phases: Skip staging, focus on critical path validation
Blue-Green Deployment
- Duration: 2-3 hours
- Focus: Zero-downtime deployment with traffic switching
- Phases: Add traffic switching and gradual rollout
Database Migration Deployment
- Duration: 2-4 hours
- Focus: Database changes with backward compatibility
- Phases: Add migration validation and rollback testing
Microservice Deployment
- Duration: 1-3 hours
- Focus: Service-by-service deployment coordination
- Phases: Add service dependency validation
Success Metrics
- Deployment Success Rate: 100% successful deployment
- Downtime: < 30 seconds (if any)
- Rollback Time: < 5 minutes if needed
- Error Rate: No increase post-deployment
- Performance: Response times within 10% of baseline
Emergency Procedures
Deployment Failure
- Immediate: Stop deployment process
- Assess: Determine failure cause and impact
- Rollback: Execute rollback procedures if needed
- Communicate: Notify team and stakeholders
- Post-Mortem: Document failure and prevention
Production Issues Post-Deployment
- Monitor: Track error rates and performance
- Triage: Determine if rollback is necessary
- Fix: Apply hotfix if issue is minor
- Rollback: Execute rollback if issue is critical
- Learn: Document and improve procedures
Integration Points
- Follows: BUILD, FIX, REFACTOR missions
- Enables: MONITOR, RELEASE missions
- Coordinates with: Team communication systems
- Requires: CI/CD pipeline and monitoring setup
Mission Command: /coord deploy [tested-codebase] [deployment-config] [release-notes]
"Deployment is not the end, it's the beginning of your code's journey to users."
Post-Mission Cleanup Decision
After completing this mission, decide on cleanup approach based on project status:
โ Milestone Transition (Every 2-4 weeks)
When: This mission completes a major project milestone, but more work remains.
Actions (30-60 min):
- Extract lessons to
lessons/[category]/from progress.md - Archive milestone-relevant Phase Handoff blocks from agent-context.md if needed
- Clean agent-context.md (retain essentials, archive historical details)
- Continue using agent-context.md (Phase Handoff blocks accumulate across milestones)
- Update project-plan.md with next milestone tasks
See: templates/cleanup-checklist.md Section A for detailed steps
๐ฏ Project Completion (Mission accomplished!)
When: All project objectives achieved, ready for new mission.
Actions (1-2 hours):
- Extract ALL lessons from entire progress.md to
lessons/ - Create mission archive in
archives/missions/mission-[name]-YYYY-MM-DD/ - Update CLAUDE.md with system-level learnings
- Archive all tracking files (project-plan.md, progress.md, etc.)
- Prepare fresh start for next mission
See: templates/cleanup-checklist.md Section B for detailed steps
๐ Continue Active Work (No cleanup needed)
When: Mission complete but continuing active development in same phase.
Actions: Update progress.md and project-plan.md, continue working.
Reference: See project/field-manual/project-lifecycle-guide.md for complete lifecycle management procedures.