Logistics

Meeting Title:

Planning Council Conference Call

Date & Time:

Wednesday, August 07, 2013, at 1200 Noon Eastern

Dial in:

(See Asterisk service for complete details on SIP, potential new numbers, phone mute commands, etc.)

Phone Numbers: (Check Asterisk/Numbers for more or current phone numbers.)

For all phone lines: Participant conference extension: 710 then enter pin 35498
  • Ottawa (local call in Ottawa) 1-613-454-1403
  • North America (toll free) 1-866-569-4992 (new number), 1-877-369-7806 (old number)
  • Germany (local call anywhere in Germany) +49-692-2224-6059
  • France (local call anywhere in France) +33-17-070-8535
  • UK (toll free) 0800-033-7806
  • Switzerland (local call anywhere in Switzerland) +41-44-580-2115
  • SIP clients:
call 710@asterisk.eclipse.org, then enter pin 35498.

Members and Attendees

width="100%" valign="top"

PMC (and Strategic) Reps

Chris Aniszczyk

Technology (PMC)

Y

Dani Megert

Eclipse (PMC)

Y

Steffen Pingel

Mylyn (ALM) PMC

R

Brian Payton

Datatools (PMC)

R

Doug Schaefer

Tools (PMC)

Y

Adrian Mos (or Bob Brodt?)

SOA (PMC)

Ed Merks

Modeling (PMC)

Y

Ian Bull

Rt (PMC)

Y

Chuck Bridgham

WTP (PMC)

Gary Xue

Birt (PMC)

Wayne Beaton

Eclipse Foundation (appointed)

David Williams

(appointed Chair)

Y

Strategic Reps

Cedric Brun

OBEO (Strategic Developer)

Y

Neil Hauge

Oracle (Strategic Developer)

Y

Stephan Merker

SAP AG (Strategic Developer)

Y

Markus Knauer

Innoopract (Strategic Developer)

Y

Markus Tiede

BREDEX (Strategic Developer)

Y

Rajeev Dayal

Google (Strategic Developer)

(PMC rep)

Actuate (Strategic Developer)

X

(PMC rep)

IBM (Strategic Developer)

X

width="100%" valign="top"

Inactive

[no name]

CA Inc. (Strategic Consumer)

X

Note: "Inactive" refers to Strategic Members or PMCs we have not heard from for a while, and have been unable to convince to participate. Those members can become active again at any time. Contact David Williams if questions.

Note: feel free to correct any errors/omissions in above attendance record. Y = Yes, attended N = No, did not R = regrets sent ahead of time D = delegated X = not expected

Announcements

  • New Member: Dani Megert is now the Eclipse PMC representative to the Planning Council. Thanks to John for years of service. Thanks Dani for volunteering to take his place.

Luna Planning

  • Is there confusion/contradictions about "unreleased components in Sim. Rel. repo"? See .
  • For reference, see current policy.

    *It was thought this one deviation was a "fluke" and no
    systematic action needed; that for the most part, everyone
    understands*
      -
        ''a) can't release code under another project's namespace
        (can "include" it, if previously released)
        *b) if unreleased code is desired to use (it is, after all,
        EPL) you must "refactor" it into your own namespace,
        following the usual rules of attribution, maintaining
        copyright info, etc.*
    
  • Are we "too lax" in versioning requirements? Especially for "maintenance"? See cross-project list posting. [To be honest, I do not recall what specific situation this is about?]
  -
    *Ed explained the situation to us (involved versioning issues
    between XText and UML2) and it too sounded like a rare case that
    did not need to be "policed". But does highlight the importance
    of correct semantic versioning and not "adding features" with a
    mere "service increment".*
  • I have started scheduling Luna milestones. I think first 4 or 5 will be similar to previous years.
  • Can/should Planning Council say projects "should" contribute source to common repo? Or continue to "leave it up to projects" to decide?
  -
    See thread around
    <http://dev.eclipse.org/mhonarc/lists/cross-project-issues-dev/msg09506.html>
    Possibly
    \[Remember, we should make this decision based on principle, not
    the one request for an "Ultimate Package" (), since a) we should
    always work on principles\!, and b) this package may or may not
    come to fruition.\]
      -
        *It was generally agreed we should continue status quo of
        "leaving it up to project" ... let their adopters and
        community drive any changes needed/desired. Primarily,
        simply not to "add process or rules" to what many think is
        already too many rules and processes and additionally, it
        was commented, it is hard to "draw the line" ... what about
        "types of documentation", or "examples" ... i.e. there is no
        one answer that fits all projects.*
  • Discuss more frequent "(un?) coordinated releases" or updates to common repo or updates to EPP packages. (Doug, Ian).
  -
    *This item had a long discussion, covering many area, and for
    the most part, the status quo will be maintained for now.*
  -
    *A couple of things seemed to be agreed upon:*
      -
        *1) This is not something to change "this year" ...
        something longer term ... but, we need to continue the
        discussion and sort out the issues and solve them in some
        manner -- that is, there was no disagreement that the
        current schedule/rhythm does not satisfy all adopters and
        projects and we need to see if we can improve on that.*
        ''2) Other groups/projects are leaning towards "continuous
        delivery", why not us? (Or, do we already? :)"
        *3) The _main_ issue (in terms of "deliverables") -- I
        came to understand -- are the "EPP packages". That is, there
        is nothing preventing projects from releasing any time they
        would like to ... but the desire is that they'd like EPP
        packages updated at the same time. Otherwise, only
        "in-the-know" product adopters and a few savvy users know
        how to go to a project-specific repo to get updates (or,
        "new installs"). And ... some on planning council see that
        as a bad thing (ha ha ... mostly my humor :) ... but ...
        there are two sides to that story).*
        *4) There appeared to be agreement that something like
        "monthly releases" was not feasible ... too many places for
        it to "go wrong" or cause lots of additional work for
        projects (or, suffer from reduced quality). \[This was not
        literally discussed at meeting, but to add an editorial
        remark ... It seems hard enough to come out with 6 week
        milestones. It is unclear if anyone actually needed
        something as frequent as monthly or 6 week releases ... or
        if it was more a "marketing" thing? If so, could there be
        more/better/easier ways to "hype" milestones to get
        equivalent interest? If the desire really is so
        projects/adopters could release "whenever they were ready",
        then I'll just point out there is a lot of hidden
        assumptions being made in that case that in reality would
        cause the same headaches the "release train" is meant to
        solve -- primarily, it might appear to work fine the first
        time through, if everyone goes in order, but then suddenly a
        recent release, say of a commercial product, can not update
        a few months later to get the latest of some pre-req, due to
        some new feature/non-API use/deprecated API removal, subtle
        change in behavior, etc, and then they end up having to wait
        4 to 12 months anyway to get the fixes needed so they can
        "get on" that, now old, version of the pre-req ... and
        perhaps by then that pre-req no longer works with some other
        pre-req that has since released. So, point is, anyone who
        really desires this needs to think through the hidden (long
        term) assumptions and "solve" them.\] But, in general, "a
        mass repository" that may or may not work together did not
        seem to get much excitement from Planning Council, if I was
        hearing correctly.*
  -
    ''A couple of items seemed to have very different points of
    view: ''
      -
        *1) Is it a good thing to encourage "frequent feature/API
        updates" or a bad thing? Examples were given on both sides.
        On the one hand, it can be "hard on" adopters to react, if
        there are large changes requiring adopters to do a lot of
        re-testing/translating/marketing, etc. But, everyone sees
        the advantages of it, especially for a "young" project like
        EGit where they needed lots of quick improvements to be
        complete, and useful.*
        *2) An interesting, contrasting, case was made about "core
        components" vs. "leaf components". To some, it seems clear
        that something like the core platform should only apply
        maintenance for SR1 and SR2 (to ensure only steady
        improvements in quality) but on the other hand, there are
        times that changes in the core platform is exactly what
        other projects want, such as CDT, ... such as having a new
        set of APIs added that allows them to come out with a better
        (from their point of view) off-cycle release even though
        "new API" can have unpredictable effects on other adopters.
        Hard problem to solve. \[Just thinking aloud, perhaps some
        special versioning conventions and tight p2 constraints
        could allow relatively safe "forks" of something like core
        platform APIs, without impacting adopters that were not
        interested? In essence, CDT would release their own forked
        version of the platform ... just thinking out loud ... not a
        serious proposal.\]*
        *3) Not to mention, sometimes even the core Platform may
        want to add a new feature "off-cycle", such as if a new
        version of Java comes out "mid-year", perhaps they'd want to
        add "preliminary support" for it in SR2? Perhaps those types
        of cases provides some hint of how to codify the practice of
        adding features in a "service release" ... when ever
        possible, they should be done as "optional", additional
        features that adopters can take or leave. Not sure how to do
        that with core API changes, though ... short lived fragments
        that adopters can take or leave?*
  -
    So, lots to (continue to) discuss. Perhaps fundamentally, what
    does "continuous delivery" mean for something consisting of
    60-70 projects?
  -
    *Dani did state that the Eclipse PMC discussed explicitly, and
    they want to keep the status quo. Even the names "Service
    Release". That while new features can be allowed in SR1 and SR2
    (as per our existing policy) that it is not something to
    "encourage", in their view, ... they should be the exception
    rather than the rule ... and the focus on SRs should be on
    improving quality, not adding new features. (hard to do both,
    with fixed resources ... or, more accurately, without vastly
    increased resources :). New features should be "exposed" to
    public in a number of milestones, before released. \[To
    editorialize again, perhaps we need to do a better job of
    encouraging use of milestones? I think some believe that a
    "release" is the only thing consumers/users will use enough to
    provide adequate feedback on a new feature.\]*
  -
    *Doug did state explicitly that his "focus on IDE" efforts (and
    probable working group) were a whole separate issue and not in
    the Planning Council realm. (whew)*
  -
    ''\[post-call\] Another comment I heard, on arch. council call,
    was that some adopters have been surprised to hear that "we"
    allow new features in SR releases at all -- while I think "we"
    want that to continue to be allowed, we should probably do a
    better job of documenting them, perhaps as a quasi-"exception
    process" so that it is more obvious to the community of "sim.
    rel. consumers" when it does happen ... and document better some
    of the basic information: what they change or add, if they are
    optional, etc.
  • Doug also wants to discuss him taking over the "releng role" and do aggregation builds using Maven/Tycho.
  -
    The focus is still on projects providing OSGi bundles in p2
    repos, right? No matter what technology they used to get there?
    What type of "project input" is required?
    What type of "testing" is done that all is well formed and can
    be installed together and is repeatable?
    In particular, how are "IDE" vs "runtime only" components
    treated separately?
    What are concrete advantages?
  -
    *Doug said he would try to work on some prototypes. But (if I
    heard him over the spotting phone connection correctly) this
    wouldn't be anything to prevent planning to use the b3
    aggregator approach as we have been and continue with that until
    we know something more concrete, and then would be the time to
    re-discuss). The approach (again, if I heard right) basically
    makes use of a series of Jenkins (or Hudson) jobs, one
    successful job triggering the next, and progressively "building
    up" the repository. (I think is how he briefly described it).
    \[Doug, please correct if I mis-heard any of this ... we didn't
    spend much time on it.\]*

Progress on Action Items

  • Editing of "Requirements Document"? (Dani and Neil)
  • GSoC project for "Development Channel"? (Wayne)
  • Improved "aggregator examples/doc". (dw -- no progress).
  • But, about to send out "aggregator builds and streams ready" message ... depending on outcome of other items.
  • [Orbit plan "by end of August". (dw -- no progress -- will likely be late, still "in September")]
  • There were no "in-meeting" updates to any of these items, except Dani said they should start the editing during M2.

Kepler Retrospective

  • Propose to start in August (if any extra time), finish in September.
  • ''No time for a retrospective, per se, we'll try again in September ... please discuss with your projects or members you represent to see if there is anything we should document about "what worked" and "what didn't work". ''

Next Meeting

  • September 4, 2013 - Regular First Wednesday Meeting

Reference

  • EclipseCon face-to-face follow-through action items. For original meeting notes, see March_24_2013 and for discussion leading to action items, see April_10_2013. For last status update, see May_8_2013.