Logistics

Meeting Title:

Planning Council Conference Call

Date & Time:

Wednesday, February 22, 2013, at 1300 Eastern

Dial in:

(See Asterisk service for complete details on SIP, potential new numbers, phone mute commands, etc.)

Phone Numbers:

  • Ottawa (local call in Ottawa) 1-613-454-1403
  • North America (toll free) 1-877-369-7806
  • Germany (local call anywhere in Germany) +49-692-2224-6059
  • France (local call anywhere in France) +33-17-070-8535
  • UK (toll free) 0800-033-7806
  • Switzerland (local call anywhere in Switzerland) +41-44-580-2115
For all phone lines: Participant conference extension: 710 then enter pin 35498
  • SIP clients:
call 710@asterisk.eclipse.org, then enter pin 35498.

Members and Attendees

width="100%" valign="top"

PMC (and Strategic) Reps

Chris Aniszczyk

Technology (PMC)

R

John Arthorne

Eclipse (PMC)

Y

Steffen Pingel

Mylyn (ALM) PMC

Y

Brian Payton

Datatools (PMC)

Doug Schaefer

Tools (PMC)

Y

Adrian Mos

SOA (PMC)

Ed Merks

Modeling (PMC)

Ian Bull

Rt (PMC)

Y

David Williams

WTP (PMC) (appointed Chair)

Y

Gary Xue

Birt (PMC)

Wayne Beaton

Eclipse Foundation (appointed)

D (Mike)

Strategic Reps

Cedric Brun

OBEO (Strategic Developer)

Neil Hauge

Oracle (Strategic Developer)

Y

Kaloyan Raev

SAP AG (Strategic Developer)

Igor Fedorenko

Sonatype (Strategic Developer)

Markus Knauer

Innoopract (Strategic Developer)

Y

Achim Loerke

BREDEX (Strategic Developer)

Y

(PMC rep)

Actuate (Strategic Developer)

X

(PMC rep)

IBM (Strategic Developer)

X

width="100%" valign="top"

Inactive

[no name]

CA Inc. (Strategic Consumer)

X

Note: "Inactive" refers to Strategic Members or PMCs we have not heard from for a while, and have been unable to convince to participate. Those members can become active again at any time. Contact David Williams if questions.

Note: feel free to correct any errors/omissions in above attendance record. Y = Yes, attended N = No, did not R = regrets sent ahead of time D = delegated X = not expected

Juno SR2

  • SR2 Recovery Plan

(I've left in the "issues bullet" from last meeting ... to highlight some of the history here).

Background

  -
    , , and maybe ?

    [Egit message
    list](http://dev.eclipse.org/mhonarc/lists/egit-dev/msg03039.html)

    Numerous posts to cross-project list

Alternatives

Please come prepared to discuss alternatives

  • Does anyone know of any impact of delays to strategic members that might effect choices? Impact to the projects you represent on ability to do the re-work if needed?

Do nothing

Simply remove EGit 2.3 from common repo

Full respin cycle

Provide a 4th "composite" to Juno SR2

Do a "branched respin"

Summary

  • The most agreed-to item was should not ship as-is.
  • Second most agreed-to item was a full respin was too risky and too much time delay.
  • The M2E and GEF bugs are bad (especially the GEF version snafu) but felt they were not stop ship bugs, and respin for them not required. Though it was recommend GEF move to "3.10" for Kepler, since various Juno distributions will end up with a mix of 3.8 and 3.9.
  • GEF's issue was related to having multiple releases in the same repo, but specifying only "minimum requirement" in aggregation files. Everyone likely needs a refresher on importance (and syntax) of making contributions very specific ... and testing early. Just because your component is correct, doesn't mean repo or EPP package is.
  • The EGit problem was discussed the most; pros and cons to "moving up" to 2.3.1 and re-spinning, or revert to SR1 or some point before their RC4 update. Pros were lots of fixes improvements have been made. Cons were there is still risk in last minute changes to such and important piece of Eclipse.
  • Historically, we (PC) started off saying maintenance releases were bug fixes only (changes in service field only), but "loosened" the rules to accommodate projects that did frequent releases and desired to get their latest code to Eclipse users -- a noble and desirable goal.
  • PC probably needs to "tighten rules" about minor updates in maintenance releases ... say, must be in by RC1, at a minimum. Perhaps as much as "released at least one month before RC1" even?
  • EGit probably needs a "refresher course" on the value of the Simultaneous Release rules/procedures ... advantages of incremental contributions, having a cool-off or ramp-down process. (Mike volunteered Wayne to help :)
  • dw will explore easiest way to revert the repo: alternatives are to try and use the p2.remove task to remove just EGit/JGit features/bundles from the SR2 specific repo (and then EPP process would pick up what was in SR1); if that doesn't work the "make an aggregate repo from the aggregate repo" should do the trick ... just more "search and replace" in a branch of the contribution files, and time to literally respin.
  • Once new repo is done, Markus's existing process for spinning EPP packages will be ran.
  • Goal was to finish new repo on Monday (or, Tuesday, if complicated). EPP packages on Tuesday (or Wednesday). Some extra eyes/sanity checks Wednesday (or Thursday). Allow mirrors to repopulate, and make "GA" on Friday morning.
  • Ian volunteered use of his "p2 diff" tool to compare repos.
  • [After meeting, Matthias Sohn said, in message to cross-project list, that "SR2 RC3 contains EGit 2.2.0 [1] which was released in December and SR1 contains EGit 2.1.0". But, still, RC3 is late to change a minor version ... especially now that "trust" is weakened ... but assume its a little bit more stable? if "pure removal" works I'd prefer that, since easier and more predicable. If not, I'll look around and ask others if they feel 2.2 has gotten enough exposure -- but, that solution requires the "make an aggregate from the aggregate" approach ... and still lightly tested by package maintainers.]
  • The trade off on "meeting schedule" vs. "quality release" were discussed and I reminded all the importance of our timely releases are not so much for us, or even the Eclipse community, but that commercial adopters make their product plans based on our dates, so any delays introduced by us starts to cost real money to them (rescheduling tests, and what ever else) ... but, agreed that "software industry" is used to such problems and normally buffers in plans can accommodate a one week slip for data-damaging bugs, and a one-time slip of maintenance release should not hurt our trustworthiness to deliver when we say we will.

Issues (from previous meeting)

  • EGit planning 2.3, but 2.1 is still their common repo contribution? (That is, why aren't they "fully participating"?) See . Kepler contribution is even further behind.
  • Action Item: Chris will "get back to us" on what EGit's plans are ... he initially thought "final code" would be done in two weeks, but I reminded him RC4/final builds are next Wednesday.

Next Meeting

  • March 6, 2013

Reference