Iris follows Semantic Versioning 2.0.0. This page states how that maps onto a pre-1.0 project, what each number promises, and when 1.0 will be declared — so a reader can predict what an upgrade will do to them before they run it.
While the version starts with 0.
Semver gives a 0.x project one lever for compatibility: the minor.
| Change | Bump | Example from this project |
|---|---|---|
| Anything an existing caller can observe changing — a default, a response field, an accepted argument, a rule that starts or stops firing | minor (0.7.0 → 0.8.0) | evaluate_output began running every bundle when eval_type is omitted |
| New capability that leaves existing behaviour alone | minor | the trajectory rules, which skip unless tool calls are supplied |
| Fixes, documentation, dependency bumps, anything a caller cannot observe as a change in contract | patch (0.8.0 → 0.8.1) | a false positive removed from a rule's pattern list |
Every change of the first kind is written in CHANGELOG.md as a bold
Behaviour change: sentence naming what breaks and what the caller does
about it. If a release has one of those sentences, it is a minor. The reverse
holds too: a minor release without one is a release that added capability.
We have not always been consistent about this. 0.5.1 shipped two
behaviour-change sentences and was numbered as a patch. That was our error, not
a different policy, and this page exists so it does not repeat.
Release cadence
Releases are cut when a body of work is complete and has passed its acceptance pass — not on a calendar, and not per merged pull request. Several minors in a short window is a signal that work is being released in pieces that belonged together; the fix is to batch, not to renumber.
Every release is cut by the same path: a version-roll pull request through the full check set, a tag, and a workflow that publishes to npm, the container registry, the GitHub release page and the Official MCP Registry, then verifies each of those from outside before it reports success.
What 1.0 will mean, and what has to be true first
At 1.0 the compatibility lever moves to the major, and a breaking change becomes a rare, deliberate, well-announced event rather than a minor bump. We will declare 1.0 when all of the following hold, and we will say so here on the day it does:
- The response shape is settled. No planned work changes the fields of an
evaluate_outputresult or the shape of a rule result. - The rule roster is settled. Adding a rule is additive; changing what an existing rule means is not, and we expect a few more of those.
- The published accuracy has external validation. The corpus behind /proof is currently written and labelled by a language model, disclosed as such; human agreement on a sample is the upgrade that makes the numbers something to build a gate on.
- Two consecutive releases carry no behaviour-change sentence. The simplest evidence that the surface has stopped moving is that it stopped moving.
Until then the version stays below 1.0, which is the honest signal: the product is usable and measured, and its contract can still move with a minor bump.
Deprecation
Once at 1.0, anything removed gets one minor release of deprecation first: it keeps working, it warns, the changelog says what replaces it, and the removal lands in the next major. Before 1.0 we do the same wherever it costs little, but the minor bump is the only guarantee.