TDcoSim has the capability to scale from a single distribution feeder with a single DER to thousands of distribution feeders with a hundreds of DER. Due to difference in computing effort and memory footprint, the solution time increases.
In this guide we provide suggestions on reducing solution time for a given co-simulation project.
Solution time
The total solution time is comprised of three parts: Tsolution = Tinitialize + Tco-sim + Tpost-process Where, Tinitialize is the time take to setup the co-simulation, Tco-sim is the time taken for co-simulation time stepping, and Tpost-process is the time take for post-processing the simulation time. Not that each solution time component is comprised of multiple tasks.
- Tinitialize: Here individual components co-simulation is initialized.
- Read JSON configuration files
- Launch sub-processes
- Setup DER model integrators (for dynamic simulation)
- Initialize co-simulation to steady state
- Tco-sim: Here we do time stepping for individual component.
- PSS/E model:
- Solve power flow for transmission system model.
- Perform integration for dynamic models with a time step of one half-cycle (1/120 s).
- Write to .out file
- OpenDSS model: Solve non-linear algebraic problem
- PV-DER model:
- Fast-DER: Perform integration with a fixed time step.
- Dynamic Phasor: Perform integration with variable time step
- Write to disk if memory threshold is exceeded.
- PSS/E model:
- Tpost-process: Here we post process the output and write them to user defined file type from memory.
Solution time contributors
The solution time may also be expressed as a function of the specific T&D+DER co-simulation model. Tsolution = f(nBus) + f(nFeeder) + nDERFeeder*f(nDERperFeeder)
Solution time benchmarks on test systems
The following benchmark times were obtained for the following scenario using workstation with the recommended specifications mentioned in System requirements:
T system: IEEE 118 bus system
D feeder: IEEE 123 node feeder
Simulation time: 20.0 s
Events: Three phase fault from 0.2 s to 0.3 s
Number of T nodes with feeders and DER: 97
| DER Model type | DER solver type | PV penetration (%) | DER models | Solution time/Simulation time/DER (s/s/DER) |
|---|---|---|---|---|
| ThreePhaseBalanced - 50 kW | DiffEqPy (CVODE_BDF) | 25 | 1746 | 0.047 |
| ThreePhaseUnBalanced - 50 kW | DiffEqPy (CVODE_BDF) | 25 | 1746 | 0.054 |
| Fast DER - 50kW | Forward Euler | 25 | 1746 | 0.038 |