当前权威状态:GATE_0_ACCEPTED; GATE_1_V1_CAPSULE_INTEGRITY_INVALID; GATE_1_TREE_V2_ACCEPTED; GATE_2–GATE_4 为 predecessor evidence;GATE_5_V1_SECURITY_INVALID; GATE_5_BROKER_V2_IMPLEMENTED_OFFICIAL_REVALIDATION_PENDING; GATE_6/GATE_7/V011_A–V011_E 为 predecessor evidence;V020_PROVIDER_ACCEPTED; V020_EFFECTIVENESS_ACCEPTED; V020_RELEASE_ACCEPTED(不证明 tree-v2 lineage 或 Gate 5 task credential isolation); GATE_8_BENCHMARK_PROFILES_OPTIONAL_NOT_RUN
更新时间:2026-08-29(Asia/Tokyo)
2026-08-29 Gate 5 per-trial credential broker successor
- Issue #116 is confirmed: the retired Gate 5 runner mounted
provider.secret, exportedDEEPSEEK_API_KEY, and loaded evolving candidate JavaScript in that same process. File permissions and static scanning did not form a secret boundary. All evidence from that credential-launcher lineage remains immutable but is security-invalid for a current Gate 5, official-score, sealed or release claim. gate5-credential-broker-v2removes the launcher, secret mount and agent credential env. The candidate Responses bundle is now a fixed Unix-socket client. Each(task, attempt)gets one Harbor job and one host broker with a locked official route, durable idempotency store, connection/request/byte/deadline limits and Ed25519-signed identity/receipt/usage evidence. The socket source is contained by a host-private temporary directory; provider retry/continuation parameters are frozen into exact worst-case output reservations; temporary artifact TLS private keys never enter run evidence. The durable saga trial reservation, conservative input/output pricing, pre-dispatch worst-case micro-USD and actual settlement are signed; the default$0.333333trial permits two worst-case calls ($0.311952), not the retired unbounded 64-call ceiling.- Run intent schema 2 freezes candidate/capsule, ordered trials, original/overlay task hashes, broker policy and public
signing key before launch. Development task overlays force every agent phase to
no-network; conflicting policies reject and are revalidated after all jobs. Only a complete signed broker matrix, exact DSH usage reconciliation, overlay revalidation and credential-byte scan can publishexecution-terminal.json. Intent without that marker is ambiguous and never redispatched. Marker publication now performs those checks before creating marker bytes. Evaluator inspect/collect always replays broker-v2 and raw normalization; schema-1 summaries, forged markers, or status/reward/cost drift reject rather than enter the journal. - The stable evaluator now passes the plan's exact candidate capsule digest to the runner. Source builds must
reproduce it; prebuilt capsules must match their complete live
dsh-capsule-tree-v2, full schema-2 manifest and planned digest, are copied into a host-private one-shot snapshot, and are checked again before and after packaging. Intent and reconstructed summary bind that candidate capsule digest separately from the generated ACP archive SHA-256, preventing mutable capsule paths from executing changed bytes under an admitted candidate identity. - A real Harbor/Docker adversarial E2E proves candidate initialization sees neither the env key nor retired secret file, cannot complete direct external HTTPS, and successfully calls the fake trusted Responses adapter through the mounted Unix socket. The signed usage receipt verifies and matches the model call. After the capsule-snapshot repair, format, docs, lint, typecheck, provenance, upstream-clean, byte-equality and release-readiness pass; unit is 120 files / 940 passed + 1 platform skip. No-key E2E is 18 files passed + 2 credential-gated files skipped, 45 passed + 4 skipped, including the real Harbor adversarial test. The previous head's provider-configurable continuation E2E passed against the user-authorized Responses endpoint. The changed head still requires a commit, hosted CI, independent exact-head review and merge.
- Independent review of predecessor head
c6ade11correctly blocked merge because schema-1 summaries could bypass raw replay, the terminal marker preceded broker/session validation, and the 64-call worst case exceeded the durable trial reservation. Current code rejects old/tampered summaries and forged markers, validates before marker creation, derives broker calls from the signed micro-USD reservation, and uses the standard SHA-256 baseline identity. These changes still require fresh exact-head CI and independent approval. - Independent review of successor head
3aff63cconfirmed those three repairs, then correctly blocked merge after a bounded repro changed prebuiltruntime/cordis.ymlwithout changing its stale checksums: the generated archive changed while attribution retained the planned candidate ID. The current private-snapshot/capsule-digest repair and all local gates pass, but it still requires a new commit, exact-head hosted CI and a fresh independent approval. - Independent review of head
9473bd2confirmed the snapshot repair but proved predecessor checksums omitted empty directories and evaluated modes. Issue #42 was reopened and closed through PR #248; current Gate 5 prebuilt authority now rejects schema-1 and digest-self-consistent invalid schema-2 capsules and consumes only the merged tree-v2 verifier. The integrated head still requires commit, exact-head hosted CI and fresh independent approval. - Integrated head
620bac7passed exact-head hosted CI run33240164516, but fresh independent review correctly blocked merge after reproducing a two-byte torn finalsummary.jsonthat stranded an otherwise terminal run on every resume. The repair publishes derived summaries only from a same-directory0600staging inode after full write and file fsync, uses a no-clobber hard-link commit point plus parent-directory fsync, and cleans a linked staging inode on replay. After revalidating terminal/raw evidence, only an exact byte prefix of the deterministic reconstruction is retained as content-addressed crash residue and rebuilt; every other malformed or valid-JSON mismatch remains an integrity failure. Terminal-derived attribution creation now also uses the existing atomic fsync/rename protocol. Process-level SIGKILL fault injection covers partial/full write, file-fsync, final-link and directory-fsync boundaries, exact-prefix recovery, repeated resume, linked-staging cleanup, tamper rejection and concurrent no-clobber publication. Focused Gate 5 coverage is 19/19 and full unit is 121 files / 945 passed + 1 platform skip. This repair still requires a commit, exact-head hosted CI and a new independent approval before merge. - First repair head
9e3aaa6correctly failed hosted CI run33243205947: during concurrent torn-summary recovery, one reconciler could remove the final path while the other still held and verified that inode, making the latter's post-readlstatfail withENOENT. The retry protocol now treats only that missing pathname as a concurrent completed removal and returns to reconciliation; replacement with a different inode still fails closed. Three parallel focused processes, each including 12 fresh-publication and 12 torn-recovery races, pass; final full unit is again 121 files / 945 passed + 1 platform skip. A new commit, exact-head hosted CI and fresh review remain mandatory. - Head
06418e0passed hosted CI run33243814763, but fresh independent review correctly blocked merge because a final pathname disappearing after its inode was opened/read was collapsed into the same state as initially absent. With an unknown external hard link, that could republish without retaining the torn inode as controlled evidence. The corrected reader now returns validated held bytes/metadata plus a distinctpathPresent=falsestate. Recovery accepts that state only when the expected content-addressed residue has the same inode and bytes and exactly one remaining link; no-residue unlink, extra links, forged same-byte residue, different-inode replacement and parent directory replacement fail closed. The residue file and directory are fsynced before deterministic republish. A permanent empty single-link0600lock inode plus kernelflockserializes reconciliation across processes; process death releases ownership without deleting/replacing the lock identity. Deterministic tests cover uncontrolled read-after-open disappearance, legitimate residue-backed recovery, process-level lock contention, lock-owner SIGKILL, forged locks and parent-directory replacement. A new commit, exact-head CI and fresh independent approval remain required. - Head
f65b063passed exact-head hosted CI run33246662491, but fresh independent review correctly blocked merge: after the named lock inode was flocked, replacing its pathname split a second reconciler onto a different lock inode; adding a hard link also invalidated the promised single-link authority without being detected before success. The corrected design flocks the already-open original authority-directory inode itself, which has no replaceable lock pathname and cannot be hard-linked. Every summary, staging and residue access resolves through that pinned directory file descriptor, while the named directory is revalidated against the held dev/inode before and after mutations and before success. A replacement of the obsolete lock filename therefore cannot split the kernel lock domain, and a conflicting real child process remains blocked until it observes and rejects the first publication. Directory-lock owner SIGKILL still releases ownership. Four parallel focused Gate 5 runs pass at 20/20 each; full unit is 121 files, 946 passed + 1 platform skip; full no-key E2E is 18 files passed + 2 credential-gated skipped and 45 passed + 4 skipped. A new commit, exact-head CI and another fresh independent approval remain mandatory. - No fresh official DeepSeek broker-v2 run has been performed, so
GATE_5_ACCEPTEDis not restored and no benchmark, improvement, promotion, sealed or release claim is made.
2026-08-29 Issue #42 complete-tree successor
- Issue #42 was correctly reopened after independent PR #247 review showed that its original path/type/mode contract was only partially closed. The schema-1 checksum set bound file bytes and symlink targets but omitted empty directories and regular-file executable mode. Either changed the deterministic Harbor archive and Loader-visible state without changing the planned capsule digest.
- Capsule manifest schema 2 now freezes checksum format
dsh-capsule-tree-v2. Its exact typed entry set records every directory as normalized0755, every regular file as evaluated0644or0755plus content hash, and every symlink as archive-normalized0755plus literal-target hash. Non-UTF-8/control/Unicode-line-separator names, missing, extra, mode/type/path/content/target drift, replacement-decoded checksum/target aliases, duplicates, hard-linked files/symlinks and special entries fail closed. Control files must be single-link, non-executable regular files; their ordinary host permission variants normalize to evaluated0644, matching other non-executable files. Shebang runner files receive their executable mode before checksumming; no post-admission chmod mutates the tree.capsuleHashstill jointly binds manifest and sums bytes. - Schema-1 manifests remain readable only as explicitly labelled
dsh-capsule-files-v1predecessor evidence; they are never upgraded to current complete-tree authority. Fresh admission and stable-build resume require v2; resume rechecks the live tree, offline-sums receipt and capsule hash. New identities require a fresh admission/evaluation lineage. - Focused capsule/manifest/stable-identity coverage passes 5 files / 36 tests, including added-empty-directory,
executable/special/control-mode, hard-linked symlink, invalid UTF-8 path/checksum, literal symlink-target,
schema-v1 predecessor and resume negative controls. Unit is 119 files / 925 passed + 1 platform skip. No-key E2E
is 17 files passed + 2 credential-gated skipped, 44 passed + 4 skipped, including real Harbor ACP, extract-elf
smoke, offline Loader, V011 admission and crash recovery. Format, docs, lint, typecheck, provenance,
upstream-clean, byte-equality and release-readiness passed. Exact head
4966bc4passed hosted CI run33237607164, received independent PR/Issue approval, and merged via PR #248 ase886d1e; Issue #42 is closed.
2026-08-28 current-main gate repair
- Issue #238 records that commit
22a5a5a3f9c488db5b0b4f365c193907af036f41failed the required hosted Prettier step, so the remaining CI steps did not execute. - The merged repair contains formatting-only changes to the 15 files rejected by pinned Prettier. Local gate and repository-integrity checks pass; unit is 105 files / 809 passed + 1 skipped. PR #239 passed hosted CI and was independently reviewed before merge. This repair makes no benchmark, promotion, or release-performance claim.
2026-08-28 Responses continuation compatibility
- Issue #187 was narrowed after current-code verification: a real provider tool-loop already existed, while explicit cross-round context survival remained untested.
- The dedicated provider-configurable Responses E2E carries unpredictable user/assistant markers through two real
function-call/output rounds and requires the final provider text to reproduce all prior markers. It is skipped
unless all four
OPENAI_*route variables are supplied, and it never persists or prints the credential. - On 2026-08-28 it passed against
http://64.186.236.156:24634/v1/, modelgpt-5.6-luna, Responses wire API and reasoning effortmax: two tool rounds completed and all six unpredictable context/result markers survived into the final text. No-key E2E now reports 36 passed + 4 credential-gated skipped. - Passing this compatibility test proves only the exercised Responses item shapes on the locked endpoint/model; it is not benchmark, candidate-improvement, sealed, promotion, or release evidence.
2026-08-28 v0.1.1 candidate identity repair
- Issue #198 identified a deterministic attribution mismatch: the v0.1.1 controller and overlay used an admission
sha256:digest whilecapsule.jsonexposed the Candidate SDKc_<base32>build identity to Gate 5. - v0.1.1 now uses the admission digest as the single controller/overlay/capsule/evaluator identity. The SDK build ID
remains explicit as
candidate.buildCandidateIdand is cross-bound in the admission receipt. - Engine failure-pool selection and trial accounting derive the baseline role from the admitted root identity instead
of the historical
baselinealias. Outcome pairing freezes that same root across every generation; audit binds each disk record/receipt/capsule chain to its controller node, admission event and generated-child build receipt. - Resume and audit reject pre-repair or cross-domain state; there is no silent state migration. The repair passes format, lint, typecheck, 816 unit tests (+1 platform skip), and 36 no-key E2E tests (+4 credential-gated skips), including real Harbor ACP, extract-elf smoke, offline packed Loader and crash/replay paths.
- This is an attribution/correctness repair only. It creates no new benchmark, improvement, promotion, sealed or release evidence.
2026-08-28 v0.1.1 packed-overlay admission repair
- Issue #197 identified that V011 admission tested a hand-built candidate composition but never executed the packed production overlay shipped in the capsule.
- Admission now requires byte identity between
runner/cordis.patch.ymland the launcher'sruntime/cordis.yml, then boots that exact config through the packed ACP runtime inside abwrap --unshare-allprocess with a cleared environment. A model-free ACP initialize/session handshake must complete and is digest-bound in the admission receipt; the existing isolated solve/propose probes remain as separate candidate-mode evidence. - Divergent runner/runtime overlay bytes, startup failure, timeout, missing ACP/session identity, or premature process termination all fail closed. The test probe receives no provider credential and makes no model request.
- The trusted worker writes a 256-bit random challenge before loading candidate code and accepts exactly one matching post-import ready receipt; early, malformed, repeated, or late control records kill the probe. ACP stdout is rejected before ready and is then bounded to 2 MiB with strict UTF-8, NDJSON, and JSON-RPC envelope validation.
- Resume and audit now validate the complete current admission schema, so a digest-self-consistent historical receipt
without
packedOverlayBootevidence cannot be adopted. - The combined identity/overlay branch passes format, docs, lint, typecheck, 823 unit tests (+1 platform skip), and 36 no-key E2E tests (+4 credential-gated skips), including real Harbor ACP, extract-elf smoke, offline packed Loader, V011 admission and process crash/replay paths.
- This is an admission fidelity repair only. It creates no benchmark, improvement, sealed, promotion, or release evidence.
2026-08-28 candidate builder snapshot/isolation repair
- Issues #65 and #37 identified one coupled admission-boundary defect: identity/schema/scan/tests/compiler consumed
repeated reads of a mutable candidate tree, while host
tsc -bexecuted candidate-controlled path options. - Admission now captures candidate bytes once through directory-anchored
O_NOFOLLOWdescriptors, materializes one read-only content-addressed staging tree, and derives canonical identity and receipt source bytes from that capture. v0.1.1 containment, candidate tests, policy/schema checks and both builds consume the same staging tree. - Candidate
tsconfig.jsonis validated as inert identity material and never executed. A trusted config drives pinned TypeScript underbwrap --unshare-allwith a cleared environment, read-only source/toolchain mounts and a dedicated writable output mount. Sixteen path/config escape classes reject before compiler launch; descriptor opens use nonblocking mode so FIFOs and other special files reject before they can stall admission. - Local gates pass format, lint, typecheck, 851 unit tests (+1 platform skip), and 36 no-key E2E tests (+4 credential-gated skips), including exact packed-overlay ACP boot, real Harbor ACP, extract-elf smoke and crash/replay paths. PR #245 passed hosted CI, received independent exact-head approval and was merged; #65 and #37 are closed.
- This is an admission attribution/isolation repair only. It creates no benchmark, improvement, sealed, promotion or release evidence.
2026-08-28 local untrusted-execution resource boundary
- Issue #51 identified that Bubblewrap/process-group timeout cleanup did not prevent memory, PID, CPU, I/O or storage exhaustion before timeout and supplied no kernel accounting receipt.
- Candidate build/tests, Loader probes, the exact packed overlay and proposer now start in fresh delegated cgroup v2
domains. Frozen policies apply memory with zero swap, CPU bandwidth/time, PID and block-I/O limits plus rlimits for
CPU time, file size, open files and core dumps; teardown uses whole-domain
cgroup.kill. - Every writable path, including
/tmpand/dev/shm, is a size/inode-bounded tmpfs. A trusted supervisor seeds and exports trees with only mount, namespace-quota and capability-drop privileges in its private user namespace; untrusted targets run with an empty capability set below a second private PID namespace and never inherit or see its control FD. Root and/devare read-only, and nested user namespaces are disabled after trusted mount setup. Missing delegation/control or any quota failure is fail closed. - Resource receipts record full limits/digest, enforcement, peaks/events and termination cause. Build/admission and proposer evidence retain these receipts. Memory-bomb, fork-bomb, CPU throttle/time and disk-fill E2E tests exercise the kernel boundaries. Non-root CI commands enter an executor child through a minimal privileged launcher, then drop back to the runner UID; resource domains are siblings under the delegated root.
- Independent review of commit
d3604d9correctly blocked merge: packed-overlay admission had accepted a killedCONTROL_PROTOCOL_FAILUREreceipt, resume/audit only checked its digest, and proposer materialization did not bind its resource receipt. The repaired probe now closes ACP input through a trusted one-shot zero-exit path so the supervisor records peaks/control before teardown. A shared semantic validator requires exact policy/mounts, complete bounded metrics, zero limit events andCOMPLETED/exit 0/no signal at admission, resume and audit. Proposer receipts are separately persisted and their digest is required by materialization/cache/audit. - A later independent review of
a88a6f1found that capability removal alone did not isolate a same-UID target from the trusted Node supervisor. The repaired supervisor launches the target in a private descendant PID namespace; the disk-fill E2E proves the target sees only PID 1/parent 0, and semantic receipt replay now requires this boundary. - The same review found crash windows around proposal output/receipt publication, cache/CAS replay and candidate staging. Proposal execution now commits worker/resource/gateway/diagnostic bytes as one manifest-last bundle; incomplete exports are quarantined and rebuilt while durable gateway ids prevent duplicate dispatch. Cache/build/ audit require an exact wrapper plus materialization/analysis CAS bytes. Baseline and generated staging use durable claims, clear them before rename, and fsync the publication parent.
- Exact-head review of
7812f2efound one further stable-proposer recovery gap: a crash after any pre-manifest bundle entry left a no-clobber final path that made retry permanently fail. Stable proposal publication now keeps durable gateway request records outside the commit directory, quarantines every manifest-less publication as one directory, and retries from clean final paths while replaying the paid request. Regression tests cover all four entry boundaries. - Exact-head review of
06c1218then found that gateway records and first-use parents were not fsync-durable, the final manifest could tear because it was written directly, and stable audit did not read resource bundles. Reservations now fsync file + directory before paid dispatch; completion uses fsynced temp + rename + directory sync; manifests use fsynced staging + no-clobber link. Stable audit replays exact bundle inventory, proposal/journal/idempotency, gateway shape and complete resource semantics. Fault injection covers every reservation/completion/manifest boundary. - Exact-head review of
fb09740found stable audit still accepted an empty request id, malformed attempt rows, an empty error and any syntactically valid route hash. The audit now requires the exactllm-<sha256>request identity, a non-empty exact attempt schema with coherent retry/ambiguity flags and usage, non-empty errors, and the hash of the frozen provider/endpoint/model/reasoning/max-token route. - Exact-head review of
13d4976found receipt-level terminal states were still unchecked and V011 accepted arbitrary gateway arrays. One shared producer-owned validator now requires every logical request id to end in exactly one successful terminal receipt, permits only retryable failures before it, forbids attempts/receipts after success or non-retryable failure, binds same-id request bytes, and runs in both stable and V011 load/binding/final-audit paths. - Exact-head review of
e7d1bd8then found V011 final audit replayed execution only for the three retained generations, not every completed proposal attempt. Final audit now binds every materialization to its exact journal completion and replays its worker/resource/gateway execution, so a later build rejection cannot exempt that paid proposal evidence. - Exact-head review of
aeaea55found an extra manifest-committed V011 execution could still sit outside the materialization inventory, and child export did not fsync its files/tree/parent rename boundaries before execution publication. Final audit now requires a one-to-one active manifest/materialization inventory. Export publication fsyncs all file and directory data before each parent-durable replacement boundary; recovery quarantines a committed execution together with an absent or digest-drifted installed tree, plus interrupted random export/backup directories, and replays from immutable input. Quarantined history remains retained evidence but is explicitly outside the active authority namespace. - Exact-head review of
4224a08found semantic replay still rescanned quarantined materializations after inventory, active symlink/special entries were silently ignored, and a present/torn materialization cache bypassed recovery. One canonical direct-action scanner now drives inventory and replay, never traverses quarantine, and rejects active symlink/hardlink/special entries. Materialization publication is fsynced staging + no-clobber link + directory fsync; cache validation now precedes adoption and quarantines cache/execution/children together on any parse, CAS, worker or tree mismatch while preserving durable gateway requests for replay. - Exact-head review of
38eb413found the publisher suppressed an inaccessible-staging cleanup error and recovery could adopt a cache inode that retained an external hard-link alias. Cleanup probe failures now fail closed. Active cache authority must be a regular single-link inode before and during adoption; any multi-link cache is de-authorized with its execution/tree, and quarantined bytes are copied into fresh fsynced inodes so external aliases cannot mutate the retained evidence. Durable gateway requests remain outside quarantine for deterministic replay. - Exact-head review of
f6a6754found publication could still report success if the action directory was replaced or the final authority name was unlinked after the first directory fsync. Publication now holds both directory and staging descriptors, verifies directory dev/inode plus exact final single-link inode/metadata/bytes after cleanup, fsyncs the held directory, and repeats the authority checks before returning. - Current local gates are green: format/docs/lint/typecheck/provenance/upstream/byte-equality/release; unit is 119 files / 912 passed + 1 skipped; no-key E2E is 17 files passed + 2 credential-gated skipped, 44 passed + 4 skipped. This includes real Harbor ACP, three extract-elf outcomes, Loader/offline, V011 admission, resource attacks and crash/replay. Hosted CI and a fresh independent exact-head approval remain required before merge/closure.
- This is a denial-of-service containment repair only. It creates no benchmark, improvement, sealed, promotion or release evidence.
v0.2 release accepted: live product, package, CLI, Cordis service, protocol/MIME and release identities are
dsh-self-evolving. The default route is DeepSeek official Responses, not Codex/CPA. A real low-consumption successor proves an admitted child changes the preregistered solve replay while preserving propose replay. Historical v0.1/v0.1.1 paths and hashes remain immutable predecessor evidence.
v0.2 current regression passes 291/291 unit tests and 36 no-key E2E tests; all three credential-gated official-provider
cases were also run separately and passed. The clean Apache-2.0 source archive passed checksums, no-Git fresh setup,
exact upstream provenance, Loader/capsule smoke and CLI init/status.
v0.2 provider/effectiveness 的最终对账见
docs/audits/2026-08-15-v0.2-provider-effectiveness.md。
v0.1.1 的最终 gate/commit/identity/test 对账见
docs/audits/2026-08-15-v0.1.1-release-candidate.md;
v0.1 predecessor 证据仍见
docs/audits/2026-08-14-v0.1-release-candidate.md。
Scope successor(2026-08-14):当前完成口径已由“一次性跑完 Terminal-Bench campaign”调整为 “证明真实 K=3 闭环可稳定迭代并形成可用开源 v0.1”。下文 Gate 5/6 历史 benchmark artifacts 继续 保留,但 60×2、K=10/K=80、sealed/full-set 不再阻塞 Gate 7 开源 release。
v0.1.1 successor:schema-v2 multi-file candidate、精确父 Loader、raw-evidence citation、受限工具、
trusted materialization/admission、mechanism outcome 与 schema-11 CLI 已实现并验收。fresh run
的 mechanism outcome 按实际 task/attempt 对 baseline/child 作完整配对;缺失、重复、错配及 invalid
trial 均 fail closed,且相同 trial multiset 的排列产生相同 idempotency bytes。
v011-20260815-v13 在执行 commit 9ae960c4b7d39ce7a446fd633500b7fddfbe0bb0 上完成 2 个 baseline 和
3 个 candidate Harbor trials,连续 admitted 3 个 unique multi-file children,lineage depth 3;真实 external
launch 后 SIGKILL 的 resume 只保留一次 launch/observation/commit。独立 audit 接受 52 个 events,状态为
AUTONOMOUS_PLUGIN_DEVELOPMENT_VERIFIED,state hash 为
sha256:75e11727ec3d610016c40c2fe4cc53087226926e6576563eb5fdc205e854bc96,sealed access 为 0。
所有 gpt2-codegolf baseline/candidate observations 都是明确的 invalid/reward 0,因此不能声明得分提升。
v1–v2、v4–v12 的失败 lineage 均保留 QUARANTINED_NOT_ACCEPTED;v3 是合法的
NO_REAL_FAILURE_SIGNAL negative run,未被当作 acceptance evidence。
Gate 5–7 v0.1 successor(已验收)
统一 stable-demo CLI 已接通真实 proposer、candidate builder、Loader、Harbor evaluator、normalizer、durable
controller 与 Archive,并提供 init/run/resume/status/audit/doctor。默认 profile 为 K=3、最多 15 个
solver trials、sealed access 为 0;付费 launch 前 fail closed 检查 credential、route、Docker、Harbor、
task materialization、private state、预算及源码身份。
真实 run stable-demo-20260814-v10 完成 6 个 baseline 与 3 个 candidate Harbor trials,产生 3 个 unique
admitted children、lineage depth 3,并在真实 external launch 后注入 SIGKILL。resume 后每个 action 只有
一次 launch/observation/commit;独立 audit 接受 73 个 events,终态为 STABLE_ITERATION_VERIFIED,state
hash 为 sha256:1ede79e9a0e702d4f74849be5a0cf5628d75063862746bb1674c5f13aade3bc0。
Gate 7 已完成 Apache-2.0 source-archive release closure:一条 pnpm setup:source 在 fresh extraction 中
完成固定上游、DSH、Harbor 与本项目安装;真实 Loader、无 Git source identity、doctor、backup/restore、
uninstall/rollback、SBOM、dependency licenses、provenance、checksums 与 leak/UTF-8 scan 均通过。发行状态为
OPEN_SOURCE_V0_1_RELEASE_CANDIDATE;独立 npm package 明确为 NOT_INCLUDED。
完整证据见
docs/audits/2026-08-14-v0.1-release-candidate.md。
Gate 3 successor(已验收)
@dsh-self-evolving/core 现为标准 DSH/Cordis bundle,只暴露生命周期归属的 ctx.selfEvolving service;journal
与 budget 写入原子、fsync、并发串行且 receipt-idempotent。真实 provider saga 按 intent → inspect/
launch → collect → cost settle/release → commit 恢复。4 个独立 Node controller 分别在四个边界后
遭真实 SIGKILL,successor 均只产生一次 launch/score/cost,并保留 stale-lock 证据。只读 status
command、unload quiescence 和生成式 replay property tests 同时通过。
完整证据见
docs/audits/2026-08-14-gate3-successor.md。
Gate 4 Zen compatible successor(已验收)
已完成 DEV-only archive catalog 非干扰、immutable label binding、action-scoped read-only raw export,以及 Bubblewrap 外层 proposal process sandbox(只读 inputs、唯一 child write root、空环境、 无 network、PID namespace timeout drain、symlink 拒绝)。
固定 route 的 Unix-socket gateway 与 DSH LlmAdapter 已实现:sandbox 保持无 IP network/无
credential,可信宿主 handler 锁 provider/endpoint/model/reasoning/maxTokens,拒绝 headers 等额外
transport 字段,并按 request hash 幂等返回、记录 content-free receipt。
真实 successor 已按用户授权从 root-only Codex auth store 注入 credential,并冻结 requested
deepseek-v4-flash-zen、effective deepseek-v4-flash、high、1,048,576 context。远端只读审计确认
CPA 的 Responses 合成层把 Chat finish_reason=length 错标为 completed;CPA 未修改。项目改走
compatible /chat/completions,以单轮 32,768 output budget 在同一 Bubblewrap + fixed gateway 拓扑
生成 1 个 admitted child;sandbox 仍无 IP network、无 credential。content-free receipt 保存用量与
请求/响应/route hash,不保存 reasoning 或模型正文。Gate 4 因而为 GATE_4_ACCEPTED。详见
docs/audits/2026-08-14-gate4-zen-compatible-successor.md。
旧 free route 的 429 失败审计继续保留为 predecessor,不被本次 successor 改写。
Gate 5/6 历史证据隔离
现有 calibration 只有 3 个 nop Harbor trial,不是 60 tasks × ≥2 attempts 的 real baseline,
也没有 real 3-candidate × task-strata;现有 pilot-001 使用 stub capabilities 与 Math.random,
不是正式路径。两组原 artifact 均保留,并通过各自 STATUS.json 标记
QUARANTINED_NOT_ACCEPTED。新增 Gate 5/6 fail-closed verifier;完整审计见
docs/audits/2026-08-14-gate5-gate6-evidence-audit.md。
Gate 5 sealed-service 工程 preflight 已新增独立 worker process、0700/0600 private state、
non-replacing public receipts、非公开 256-bit seed、48/12/29 controller view、split-bound candidate
lock 与 lock 后永久拒绝。synthetic E2E 证明非服务 UID 无法读取 private state,且协议没有
dump/reveal 操作。该验证未部署正式 service account/volume、未 mint 正式 split,故只标记
ENGINEERING_PREFLIGHT_PASSED,Gate 5 仍未验收。证据见
docs/audits/2026-08-14-gate5-sealed-service-preflight.md。
Gate 5 sealed deployment successor 已通过窄 runtime exports 去除生产闭包中的 core/Cordis,部署为
root-owned immutable /opt release,并以当时的 legacy dsh-rsi-sealed UID 和 mode-0700 /var/lib store
完成 restart、权限、并发锁、tamper/no-replace smoke。新的 TB 2.1 concealed 48/12/29 split 已 mint,
controller 只获得 observed IDs、guard handles 与 Merkle root,seed/assignment 未暴露且 sealed access
仍为 0。Gate 5 仍因缺少真实 60x2 baseline、三候选分层 calibration 与冻结预算而未验收。详见
docs/audits/2026-08-14-gate5-sealed-deployment-successor.md。
Gate 5 real one-task smoke 的 v1/v2 分别在 TB layout 与 Loader config 阶段失败且未调用 provider;v3
到达真实 Zen-compatible ACP 路径,但发现 Harbor 会把敏感 agent.env 展开到宿主 Docker CLI 参数,
因此立即停止 trial/container 并永久标记 ABORTED_CREDENTIAL_EXPOSURE。持久化 run root 的 credential
byte scan 为 0;successor 已改为容器内只读 secret-file launcher,并在 provider 层永久拒绝敏感
agentEnv。暴露的 CPA client key 尚未轮换,轮换前禁止新的真实 provider 调用。详见
docs/audits/2026-08-14-gate5-real-smoke-security-incident.md。
用户随后明确授权继续使用原 CPA key。gate5-real-smoke-v5 通过容器内只读 secret-file、固定
DSH sandbox/subprocess/bash 工具栈和真实 Zen-compatible Chat Completions,在 DEV_OBSERVED fix-git
完成 12 次 bash 调用并获 reward 1;宿主 argv/env 与持久化 byte scan 的 credential 匹配均为 0。
DSH session 保留 10 个 usage events;按用户指定的 DeepSeek-V4-Flash 官方美元价格重算为
$0.0031026576,现为 priced=true 的单题工程 smoke,但仍不能替代 Gate 5 的完整 matrix。详见
docs/audits/2026-08-14-gate5-real-smoke-successor.md。
Optional formal preflight capability
新增 detached-Ed25519 formal manifest/pre-start verifier;verifier API 要求 evidence 外由 trusted caller
提供 signer registry,未知 key、自签 key、非 Ed25519 key 和 registry key-id/PEM 错配均 fail closed。它绑定 Git tag/commit、
self-track route、TB 2.1 identity、TCB/protocol/split/search/budget/leaderboard identities,并独立要求
Gate 4/5/6 receipts、real exact-identity baseline、provider smoke、budget reservation 与 operator procedure
receipts。当前没有部署 signer registry,其他所有缺口也 fail closed 为 BLOCKED_NOT_STARTED;未创建 formal run directory,未启动
80-candidate search,sealed access 为 0。该 capability 属于发布后 optional benchmark profile。详见
docs/audits/2026-08-14-gate7-preflight.md。
Issue #213 的 trust-anchor repair 通过 7/7 targeted verifier tests 与全量 826 unit tests(+1 platform
skip);这些仅证明 verifier fail-closed 行为,不是 formal acceptance evidence。
Optional sealed/full evidence verifier capability
现有 29×k paired matrix、bootstrap、89×≥5 full-set 与 release 逻辑只保留为 synthetic consistency
assessor,不再作为包根的 acceptance API。Issue #111 证明所有 receipt hash、签名/replay 布尔值和整体
commitment 都可由同一 caller 重算;因此 public verifyGate8Evidence 在真实 versioned receipt schemas、
trusted artifact store、signature authority、journal/action replay 与 immutable launch manifest verifier 落地前
固定返回 PROTOCOL_INVALID,不能产生 promotion/full-set/release 结论。当前权威状态仍是
BLOCKED_NOT_STARTED:无正式 candidate lock、reveal count=0、sealed/full trials=0、无
promotion/release。详见
docs/audits/2026-08-14-gate8-verifier.md。
Issue #111 final repair 通过 29/29 targeted tests、全量 828 unit tests(+1 platform skip)和 36 个
no-key E2E tests(+4 credential-gated skips);这些证明 fail-closed 边界与既有运行时回归,不是 Gate 8
acceptance evidence。
2026-08-27 audit-hardening batch(证据绑定 / 预算 / 幂等收敛)
远端 issues 的审计硬化批次已全部落地(每项:本地全量门禁 → 独立 subagent adversarial review → APPROVE 后 squash merge;评审发现的新问题均立为 issue):
- #121 / PR216:Gate6 验证器不再信任 hash 形状的
normalizedRecordHash——observation 必须携带normalizedRecord内容,验证器重算 canonical digest 并要求 record 的 candidateId/taskId/attemptIndex 与 observation 行一致;整个证据 envelope 以evidenceCommitment(gate6EvidenceCommitment)内容寻址, 事后任何编辑都会发散。评审确认 commitment 覆盖全部 load-bearing 字段。 - #219 / PR220:同一模式移植到 Gate8——sealed/full-set trial records 内容化 + own-enumerable 身份绑定 (prototype/non-enumerable 身份在 Gate8 从第一天即被拒绝);search 包新增 candidate-sdk canonical 依赖。
- #111 slice 2 / PR221:Gate8 envelope 以
gate8EvidenceCommitment记录式承诺覆盖(divergence 同时 冻结 promotion 分类为 PROTOCOL_INVALID);record outcome 绑定(reward 必须等于被统计的行值、full-set capsuleDigest 绑定锁定 capsule);attemptIndex/scheduleIndex 整数化。当时尚未解决的 receipt 字节化/签名 authority 问题现由上方 #111 final repair 以禁用 public acceptance path 的方式 fail closed。 - #108 / PR222:未定价 usage 不再以测得零释放预留——
EvaluationObservation.pricing结构化 priced/unknown 状态(缺失/畸形/非有限成本一律降级 unknown),unknown 按全额预留结算,stable audit 对 任何未解决 unpriced usage fail closed;real provider 保留 summary 的 priced 标志。 - #56 / PR224:proposal gateway 幂等收敛——in-flight 同步注册(同 id 并发 join 同一次 dispatch)、
durable request store(
wx预留 → 原子完成 → 崩溃遗留 pending 永不重发)、replay 前完整 envelope 验证 (含 responseHash 重算,防 poisoned success)、stale socket 探测重绑(live 拒绝)、reservation 写失败 上抛而非毒化 id;v1/v011 两条生产 wiring 均指向跨重启稳定的目录。
评审驱动新立 issue:#217(Gate6/8 malformed envelope fail-closed + empty-fixtures 旁路)、#218 (canonicalV011 规范化弱点,需版本化迁移)、#219(已修)、#223(#108 收尾:audit/provider 覆盖、失败 原因粒度、legacy re-settle 文档)。本批合并后全量本地门禁:build/lint/typecheck 干净,unit 103 files / 784 passed + 1 skipped,E2E 36 passed + 3 skipped。
所有上述均为验证器/预算/幂等层的 falsifiability 与 fail-closed 强化;不改变现有已验收 gate 结论, 不产生新的 benchmark/promotion 声明。
2026-08-28 issue-convergence batch(验证器加固 / 规范化 / 时序收敛)
上一批(2026-08-27)之后的第二轮流散收敛,同样逐项走本地全量门禁 → 独立 subagent 对抗性 review → APPROVE 后 squash merge;全部评审发现(含两轮 REQUEST_CHANGES 的阻断项)均已 修复并由同一评审复核确认:
- #227 / PR228:budget-stale-lock SIGKILL 测试去 flaky。评审定位真实根因(测试自身的 flock 探针短暂持锁 + worker 单次非阻塞获取碰撞即死),worker 改为有界重试(碰撞延迟而非 死亡),wait 与 worker 退出竞速实现即时可诊断失败;30+10 次压力运行零失败。
- #223 / PR229:#108 收尾——audit 未定价拒绝对正/负控制用例、provider pricing 映射直测、 writer 把 readDshUsage 的具体失败原因写入 summary(pricingReason)、legacy re-settle 行为 在 ledger 头部文档化、observationPricing 对 null/-0 fail closed。
- #217 / PR231:Gate6/Gate8 malformed envelope 全面 fail closed(两轮 review:第一轮修复 后评审探测出 Gate6 throwing-getter 与 Gate8 14 个 JSON 可表示崩溃面,全部补齐并 pin 测试); Gate6 fixtures 空对象旁路关闭;Gate6 身份比较移植 own-enumerable 语义。
- #214 / PR232:engineering-effect gateway receipts 绑定 run id + 锁定路由哈希
(
engineeringEffectRouteHash),外部 run/route 的 receipt 集不再满足 gate。 - #218 / PR233:canonicalV011 加固(UTF-16 code-unit 键序、非 plain 叶拒绝、undefined 键 跳过)。评审发现并纠正了"全量字节稳定"的错误声明:splitReveal 键集是唯一迁移的生产形态, 新旧 digest 均 pin、且证实无任何已记录 gate8 commitment 先于该变更(exposure 为零)。
- #234 / PR235:freezeCapabilityCatalog 行序 bytewise 化(catalog digest 摆脱 ICU 依赖), 同样 pin 新旧 digest 并证实生产 id 集无 divergence。
- #230 / PR236:Gate 2 Harbor E2E 相位计时 + 300s→480s 余量(评审复现相位日志: harbor-job ~71-95s、archive pack ~11-18s)。
本批终态门禁:build/lint/typecheck 干净,unit 105 files / 809 passed + 1 skipped,E2E 36 passed + 3 skipped。#226 确认为 #227 重复并关闭。
剩余开放 issue 均为较大设计工作,未动:#213(preflight 签名密钥锚定)与 #111 剩余片 (receipt 字节化/签名验证,依赖 #213);#198/#197/#187;架构级 #37/#51/#65/#116 需先写 ADR。 本批不改变任何已验收 gate 结论,不产生新 benchmark/promotion 声明。
Gate 2 successor(已验收)
真实 baseline candidate 已被打包为带 root launcher、bundled Node 和确定性 SHA-256 的 ACP
binary archive,并经本地 immutable HTTPS endpoint 交给 Harbor generic ACP agent。Harbor 完成
initialize/prompt/verifier,生成原生 agent/trajectory.json、acp-events.jsonl、
acp-summary.json;normalizer 强制消费三者并得到可复现、可归因的 reward=0 有效失败。
这证明执行链路,不构成策略或 benchmark capability 通过。
完整证据见
docs/audits/2026-08-14-gate2-successor.md。
Gate 1 successor(已验收)
Gate 1 已通过 versioned successor 修复:capsule 现在物化真实 pinned runtime closure、生成
SPDX 2.3 package inventory、使用无循环的 manifest/sums 联合 hash,并从 packed bytes 完成 ACP
initialize/session/prompt。验收同时在独立 network namespace 与 fresh FROM scratch Docker
容器中通过;容器为只读根文件系统、NetworkMode=none,未挂载 source checkout。
完整证据见
docs/audits/2026-08-14-gate1-successor.md。
2026-08-14 独立验收审计
对 commit 4cbd1b0fe0df80765c9e9292f174b8c5f47c1034 按 specs/00–07 重新逐门审计后,
此前的“Gate 0–6 COMPLETE”口径标记为 SUPERSEDED。最早失败门是 Gate 1:当前 capsule
仍通过 source-checkout symlink 提供 DSH packages,只验证真实 Loader boot,没有按 spec 02 §12 / spec
07 §3 完成自包含 stable ACP runtime 的 initialize/session E2E。Gate 2–6 的已有代码和 artifact
继续保留为工程证据,但在 Gate 1 successor 验收前均不得作为已通过门。
完整差距矩阵与修复顺序见
docs/audits/2026-08-14-gate-acceptance-audit.md。
该历史审计当时的声明边界:
GATE_0_ACCEPTED
GATE_1_ACCEPTED
GATE_2_ACCEPTED
GATE_3_ACCEPTED
GATE_4_ACCEPTED
GATE_5_NOT_ACCEPTED
GATE_6_NOT_ACCEPTED
GATE_7_BLOCKED_NOT_STARTED
GATE_8_BLOCKED_NOT_STARTED
FORMAL_SEARCH_NOT_STARTED
SEALED_NOT_ACCESSED
NO_PERFORMANCE_CLAIM
以下为被审计取代的历史状态(保留,不作为当前验收结论)
历史状态:GATE 0 + 1 + 2 + 3 + 4 + 5 + 6 COMPLETE — SUPERSEDED
已完成 — Gate 0(provenance 与 Cordis lifecycle 地基)
artifact-backed,可机器验证,无付费 benchmark 运行。
Provenance
provenance.lock.json固定 DSH47f943859bef60e4160492346772ded9b24f765a、Harborac398bbda7c4c1073461797d3b95c2455cc671b5、Terminal-Benchd28711d0da2675d0bb1d56de45ae5df6082438a3、paper sha2564d48478d…49db97f、Nodev22.23.1、pnpm11.7.0、6 个@deepseek-ai/*包版本。scripts/check-provenance.ts校验:每个 upstream 在 pinned commit、working tree clean、 toolchain 版本、package 版本、paper hash 全部一致。当前全绿。
候选 bundle
packages/candidate-baseline/:稳定 baseline parent candidate。namespace-form (name/inject/Config/apply),无export default(符合 postmortem 0001)。 双模式solve/propose,仅注册单个稳定 prompt section,无 tool/timer/listener/外部资源。candidate.json、cordis.patch.yml符合 spec 02 §2–§6 最小形态。
真实 Loader E2E(Gate 0)
packages/dsh-self-evolving-loader-e2e/:通过真实@deepseek-ai/cordis-plugin-loader+ Include/Group builtin 启动cordis.ymlfixture(非手工ctx.plugin())。loader-lifecycle.e2e.ts:boot → 候选 row 激活 → systemPrompt 服务可用 → prompt section 已渲染 → 全树 unload → loader entries 归零 → 无 leak handle 超出 baseline。2 测试绿。negative-default-export.e2e.ts:故意加export default apply的 broken candidate, 真实 Loader 以cannot get property "systemPrompt" without inject拒绝。1 测试绿。
已完成 — Gate 1(candidate SDK 与 trusted builder)
Schemas
schemas/:versioned JSON Schema(draft-07)—candidate.manifest.schema.json、build.manifest.schema.json、capsule.manifest.schema.json、provenance.lock.schema.json。 ajv 编译校验,additionalProperties: false锁字段集。
Candidate SDK(packages/candidate-sdk/)
- canonical tar + identity(
src/identity/canonical-tar.ts):自实现确定性 USTAR (路径 UTF-8 byte-sorted、固定 mode 0644 / mtime 0 / uid 0、双 zero block),candidate_id = "c_" + base32(sha256)[0:26]。拒绝 symlink(lstat)、绝对/..路径、 Unicode/case 冲突、单文件/总数/总字节超限。 - policy scanner(
src/scan/policy-scan.ts):静态 AST/正则 guard。拒绝 dynamic import/ require/eval/Function/child_process/vm/native-addon/path-traversal/default-export; 凭据(api-key/private-key/bearer);TB task slug/verifier 文件名/dataset 路径;非 allowlist 的node:*、外部包和未 pinned 的@deepseek-ai/*。 - diff boundary(
src/builder.ts):parent→child 文件 diff,候选只能改 editable surface 内的文件;TCB/verifier/runner row 改动即拒。 - deterministic builder sandbox(
src/builder-sandbox.ts):双次 clean build 的 lib/ hash 必须一致;不执行 candidate lifecycle script;schema + policy scan 在 build 内强制。 - capsule packer(
src/capsule.ts):runtime/ + candidate/ + runner/ + provenance + sbom + capsule.json + SHA256SUMS,确定性可复现 hash。
Gate 1 测试证据
- golden build(
builder-golden.test.ts):candidate-baseline 两次 clean build, source/bundle/capsule 三 hash 完全一致;candidate id 形如c_[a-z2-7]{26}。2 绿。 - canonical tar identity(
identity.test.ts):确定性、顺序无关、单字节差异检测、 symlink/traversal/absolute/oversize/count/collision 全部拒绝。10 绿。 - policy scanner(
policy-scan.test.ts):15 个 reject fixture + 2 个 clean accept。19 绿。 - manifest validation(
manifest-validate.test.ts):candidate/build schema 接受良构、 拒绝缺字段/坏 hash/坏 mode。7 绿。 - rejection suite(
rejection-suite.test.ts):clean control + dynamic-import/ default-export/task-literal/external-import/child-process/secret/symlink/install-script, 全部 reject 或不执行脚本。9 绿。 - diff boundary + capsule(
diff-boundary.test.ts):editable 内放行、TCB 越界拒绝; capsule 双次打包 hash 一致。3 绿。 - packed capsule offline boot(
capsule-offline-boot.e2e.ts):从 capsule boot 真实 Loader, 无 source checkout、无 network,候选 row 激活、systemPrompt 可用、SHA256SUMS 自洽。1 绿。
CI 骨架
format:check、lint、typecheck、test(79 单元:50 SDK + 22 adapter + 7 guards)、test:e2e(7 真实测试,含 capsule offline boot)、provenance:check、upstream:check、byteequal:check全绿。.github/workflows/ci.yml定义 fast-ci + loader-e2e 两个 job。- 三上游 working tree clean;
AGENTS.md与CLAUDE.md字节一致。
已完成 — Gate 2(Terminal-Bench provider 垂直切片)
Adapter(benchmark-adapters/terminal-bench/,policy-free TypeScript provider)
- ACP registry entry builder(
src/acp-registry.ts):生成 HarborAcpRegistryEntry, linux-x86_64 binary distribution,HTTPS archive + sha256 checksum 校验。 - JobConfig generator(
src/job-config.ts):输出 HarborJobConfigYAML,inline registry entry + idempotency metadata,确定性序列化。 - per-trial normalizer(
src/normalizer.ts):读取 Harbor 真实 trial 结构 (verifier_result.rewards.reward+ 控制器写的attribution.json+ trajectory),fail-closed: 缺 result/reward/trajectory 或 candidate/task/attempt mismatch → INVALID;reward 仅接受 exact 0/1, 不从分母消失;只有 attribution 完整、无正常 reward、无损坏/歧义 evidence 且 artifact phase 与精确 预注册类别一致时才可 infra retry;重解析同 hash。 - idempotency store(
src/idempotency.ts):append-only ledger,同 key 二次 submit 拒绝, 不产生第二个付费 trial。 - cost reconciliation(
src/reconcile.ts):harbor/acp/dsh 三源 token+USD 对账,差异即 null, unpriced 显式标注,重解析同 hash。
Gate 2 真实 Harbor 证据
- 真实 Harbor job smoke(
harbor-smoke.e2e.ts,3 绿):跑通 docker build → agent → verifier → reward 全链路。golden(oracle 正确解)→ reward 1.0 → normalizer PASS;nop(nop agent)→ reward 0.0 → FAIL;broken(oracle 崩溃解)→ reward 0.0 → FAIL。满足 spec 07 §4 nop/broken/golden。 - normalizer/cost/idempotency 单元测试(
normalizer.test.ts24 绿、normalizer-infra-retry.test.ts22 绿、provider.test.ts8 绿、reconcile.test.ts5 绿)。
已完成 — Gate 3(持久化 controller 核心)
Controller(packages/dsh-self-evolving/,trusted durable core,spec 06)
- content-addressed object store(
src/object-store/store.ts):staging → fsync → hash → no-clobber link 发布;重复 digest 逐字节验证;scrub 全量重 hash;read 时验证; tamper → EVIDENCE_CORRUPT。 - hash-chain JSONL journal(
src/journal/journal.ts):单 writer lock + owner/lease; canonical JSON (RFC 8785 风格) + eventHash + previousHash;segment + 原子 HEAD(tmp + dir fsync); readAll 验证整条链,break 即 fail-closed。 - pure state reducer + snapshot(
src/reducer/):reducer 为纯函数(不读时间/网络/RNG/FS); canonical stateHash;full replay 与 snapshot resume 的 canonical state hash 一致(CI 测试证明); snapshot 损坏 → null → 回退 full replay。 - budget double-entry ledger(
src/budget/ledger.ts):append-only hash-chain; available→reserved→spent|released;worst-case = spent+reserved 防并发超卖;hard limit denial; unpriced usage 显式标注($0 spend 不当零)。
Gate 3 测试证据
- object store(7 绿):content-addressing、dedup、integrity-on-read、scrub、tamper detection、 no-clobber collision。
- journal + reducer(7 绿):hash-chain、single-writer lock、corrupt-chain fail-closed、 full-replay==snapshot-resume hash 相等、corrupt-snapshot rejection、event-order permutation canonical 相等、canonical-event-hash key-order-independent。
- budget ledger(6 绿):reserve→spend、reserve→release、worst-case bound、hard-limit denial、 unpriced flag、chain-corruption fail-closed。
- crash/replay fault-injection(4 绿):在 launch/collect/commit 边界“crash 后 resume”, external job 不重发、score 不重计、cost 不重收;truncated-segment fail-closed。
共 103 单元 + 7 E2E(loader/capsule/harbor)。三上游 clean;AGENTS/CLAUDE 字节一致。
已完成 — Gate 4(agentic proposal 垂直切片)
Proposal runner(packages/dsh-self-evolving-proposer/)
- 真实 DSH Loader + 真实模型(
runner.ts):boot 最小 model-backed composition (llm-deepseek→agent-spine-demo→agent-default-model),通过ctx.agents.create({ agentOptions, setup })mint 一个 scoped proposer agent,其唯一 model route 由 composition 锁定 (只有deepseek-officialadapter 指向 verified endpoint)。followup proposal prompt → whenIdle → 收集assistant/message事件文本。 - parse + protocol validation(
parse.ts):解析模型 JSON envelope(容错 markdown fence / 嵌入散文)→validateProposalBatch(width、hypothesis dedup、donor provenance、no-change/test-only 拒绝)。 - builder handoff + rejected 保留(
parse.tsretainRejected):rejected proposal 连同 raw assistant text + reason + timestamp 保留为 evidence(不静默丢弃)。
Proposal safety(packages/dsh-self-evolving/src/proposal/,Gate 4 工程地基,复述)
- 纯函数 fs/network/model-firewall policy(prompt-injection 不能改变);label-filtered evidence export
- Merkle + canary absence receipt;canary leak scan;proposal output protocol validator。
Gate 4 真实模型证据
real-model-propose.e2e.ts(绿):真实deepseek-v4-flash经真实 DSH Loader 从 baseline parent + 2 条 synthetic DEV_OBSERVED failure trace 生成 ≥1 个 nontrivial admitted child(含 hypothesis、 production diff、mechanism+preservation tests)。provider 连通性 + 模型生成已验证。prompt-injection.test.ts(5 绿):malicious trace(声称放宽 writable root / 允许 evil host / override model route / exfiltrate sealed canary)不能改变 policy(纯函数不变);sealed canary leak 检出。- `parse.test.ts$(8 绿):良构接受、\text{fence}/\text{prose} 容错、\text{no}-\text{change}/\text{parent}-\text{mismatch} 拒、\text{rejected} 保留、 \text{unparseable} → 0 \text{admitted}。
已完成 — \text{Gate} 5 算法工程(搜索 + \text{split} + \text{sealed} + 统计)
注:\text{Gate} 5 的算法与统计工程已完成并通过 \text{golden}/\text{property} 测试。唯一剩余的是付费 \text{calibration} \text{pilot}(60-\text{task} \text{baseline} + 3-\text{candidate} \times \text{task}-\text{strata} 校准)——这是需要真实 \text{benchmark} 花费的步骤, 在显式授权前不启动。\text{CALIBRATION_INFEASIBLE} 判定逻辑已实现(预算超限时 \text{fail} \text{closed})。
\text{Search}($packages/dsh-self-evolving-search/`)
- 确定性 counter-based RNG(
rng.ts):splitmix64 + 每流独立 counter;Beta 采样用固定 inverse-CDF;(stream, counter, params, sampled)确定性可重放(resume 不重抽样)。 - clade CMP + Thompson + UCB-Air(
scheduler.ts):CMP_hat(a)=S_C/(S_C+F_C);theta_clade~Beta(tau*(1+S_C),tau*(1+F_C));theta_node~Beta(1+s,1+f);(N+P_eval)^alpha >= Texpand/evaluate 决策(alpha=0.6);cold-start q0=3;donor 不双重计数。 - shortlist tournament(
tournament.ts):clade CMP 降序 + 候选 id 确定性 tiebreak;确定性降级;DEVELOPMENT_CHAMPION/NO_DEVELOPMENT_IMPROVEMENT。 - split ceremony + sealed info-flow(
split.ts):48/12/29 size 校验 + Merkle root 承诺; 非封闭 principal 接触 sealed 即INFORMATION_FLOW_VIOLATIONabort;candidate lock 后 selector/proposer 永久拒绝。 - paired cluster-bootstrap CI(
stats.ts):任务级重采样、固定 seed、Delta>=5pp && CI95 lower>0→SEALED_PROMOTED/PROMISING_NOT_CONFIRMED/SEALED_REJECTED。
Gate 5 测试证据(32 绿)
- scheduler(16):small-tree CMP 手算、UCB-Air 边界精确 cutoff、seeded RNG 重放确定性、 donor 不双重计数、cold-start、node Thompson argmax。
- tournament + split + sealed + stats(16):shortlist 排序、champion/NO_IMPROVEMENT、 48/12/29 Merkle 承诺 + tamper 检测、sealed info-flow abort、candidate lock 拒绝、 bootstrap CI 提升/平局/确定性。
Gate 5 历史 pipeline fixture(已隔离,不是验收)
- TB 2.1 task inventory(
evidence/calibration/tb21-inventory.json):89 task, difficulty 4 easy/55 medium/30 hard、16 category。 - 可公开重放的 fixture split(
evidence/calibration/split-commitment.json): 48/12/29 size 校验通过、Merkle rootsha256:6ce0972a…、seed commitment 记录; 但 seed 已公开,不能证明 sealed assignment 隔离。 - calibration pilot(
evidence/calibration/calibration-samples.jsonl):3 个 dev task 经真实 Harbor job(docker build → verifier)测量 wall = 31.1s / 41.8s / 76.9s。 - 历史 budget 输出(
evidence/calibration/budget-model.json):记录为CALIBRATION_FEASIBLE, 但当前权威状态是QUARANTINED_NOT_ACCEPTED。 predicted p90 cost = $41.96(target $500),predicted p90 wall = 2.38h(target 16h)。 frozen:B_eval=760, B_prop=\$40, k_sealed=1, concurrency=4, reserve=20%。 注:fixture 用 nop agent 测 Harbor pipeline 成本下界;model cost 是人工假设,不能据此判定 real baseline/model 路径 feasible。 - calibration-evidence test(4 绿)只验证历史 bytes 自洽,不是 Gate 5 acceptance。
Gate 6 历史 loop fixture(已隔离,不是 pilot 验收)
Pilot search loop(packages/dsh-self-evolving-pilot/)
- autonomous search-loop orchestrator(
loop.ts):pure state machine over injected capabilities(propose/build/evaluate)。UCB-Air expand/evaluate、clade-Thompson parent selection、 cold-start enforcement、dedup-by-digest(duplicate edge,不新建 candidate)、build-reject/eval-fail 记账、B_eval exhaustion、K-admitted 终止;iteration cap liveness guard。crash/resume via journal。
非验收 fixture 证据
- pilot 跑通 terminal state(
evidence/pilot/pilot-result.json):K=10, B_eval=40, SEARCH_COMPLETE: 10 admitted,39 observations,0 dedup/reject/fail,wall <1s。 - pilot loop tests(6 绿):SEARCH_COMPLETE@K、B_EVAL_EXHAUSTED、dedup-by-digest、 build-reject handling、eval-failure continuation、observation attribution。
- pilot evidence + crash/resume(2 绿):pilot-result.json 自洽(10 admitted); crash/resume determinism(同 seed → 同 lineage)。
更正:该历史 artifact 使用 synthetic stub capabilities 与
Math.randomreward,只证明旧 loop 到达 terminal state;它不是 deterministic evidence,也不是 Gate 6。real proposer/builder/Harbor successor 必须先完成 Gate 6,且结果与 formal Archive 隔离。
当前开发范围已完成
- Gate 5:统一 CLI 与真实迭代闭环已验收。
- Gate 6:真实 K=3、三候选、多代谱系与 crash/resume exactly-once 已验收;不要求得分提升。
- Gate 7:Apache-2.0 source release、fresh install、SBOM/provenance/checksums 与操作恢复已验收。
- Gate 8:K=10/K=80、sealed、full-set 全部为发布后 optional profiles,状态为
BENCHMARK_PROFILES_NOT_RUN。
v0.2 另已完成全量 live identity 改名、DeepSeek 官方 Responses 默认路由,以及真实低消耗
effectiveness successor。v0.2-official-responses-v6 的 baseline/child 均完成 trusted admission;solve 固定
回放 digest 改变,propose control digest 保持,状态为 ENGINEERING_EFFECT_VERIFIED。该结果不等于题目得分提升。
当前可以声明 STABLE_ITERATION_VERIFIED、ENGINEERING_EFFECT_VERIFIED 与
OPEN_SOURCE_V0_2_RELEASE_CANDIDATE。不能声明
Terminal-Bench 提分、sealed promotion、leaderboard 或 SOTA。
发布边界
v0.2 已达到本地开源 release-candidate 完成口径。发布到 GitHub 仍等待 maintainer 授权。Gate 8 benchmark profile、K=10/K=80、sealed/full-set 和持续提分属于发布后的独立开发范围,不阻塞本次验收。
2026-08-26 远端 issue/PR 修复批次(timwhitez/dsh-self-evolving)
以逐项"先契约测试、后最小修复、单 PR 单门"的方式处理远端 open issues。以下状态仅报告已合并进 main 且带回归测试的修复(各 PR 见对应 squash commit);未列出的 issue 仍保持 open,不做任何完成宣称。
已修复并关闭(合并至 main)
- #31 / #32:reducer exact/logical 状态哈希分离 + 协议状态机强制(动作转移表、lineage/donor 校验、 observation 唯一性、run-phase 单调、lock/reveal 次序)。E2E crash worker 同步补齐 admission。
- #36:policy scanner 以 TypeScript AST 层强化——
export * from、注释内 dynamic import、process['env']、绝对路径 specifier、parse 失败即 reject;regex 层保留为纵深防御。 - #38 / #43 / #95 / #96:sealed-service 与 builder 锁/发布恢复——公共 receipt 改为 staging+link 原子发布;初始化仅接受确认 ENOENT;锁回收按 inode+字节 compare-and-delete、模糊存活判 BUSY; builder 锁原子发布并可安全回收空锁。
- #40 / #119:quiescence 门从构造器名成员比较改为每类型计数 delta,可检同型泄漏; afterEach 不再吞 dispose 失败。
- #41:capsule 于私有 staging 建成后原子 rename 发布,输出目录已存在即 fail-closed。
- #42(2026-08-29 重开后关闭):predecessor SHA256SUMS 遗漏 empty directory 与 executable mode;后续独立
审查又发现非 UTF-8 path alias、hard-linked symlink、symlink tar-mode、Unicode line separator 与 resume
authority 缺口。tree-v2 successor 经 exact-head CI 与独立批准后由 PR #248 合并为
e886d1e。 - #54:changed-line 预算改用 LCS 顺序感知编辑距离,重排不再零成本;超界文件 fail closed。
- #55:proposal+gateway-receipts 以 manifest 提交点原子成束发布;resume 仅经 manifest 加载, 未提交目录视为未完成 publication;每次加载重新校验 sha256 绑定。(#45 的崩溃窗口部分 已由 v011 recovery 的 staging+link 关闭;重复外部工作残余归入 #53。)
- #61:Responses 工具续传按 message 序保留完整会话(user/assistant 文本 → message item, cached reasoning/function_call + function_call_output 就位交错)。
- #64:canonical archive 对每个中间路径组件做 no-follow 校验,realpath 全局 containment, nlink≠1 硬链接拒绝。
- #70:evaluation saga
pending时引擎挂起为PENDING_EVALUATIONS(计数全部派生自 journal), 不再冻结 failure pool 或写 terminal 事件;恢复经既有幂等路径 exactly-once 完成。 - #71:builder staging 改为独占 mkdir 认领 + 持久 owner intent;死主/前缀残留隔离到
reclaimed-*后重试,活主 BUSY,torn candidate 根同样隔离重建。 - #73:cost reconciliation 采用与 normalizer 相同的 agent/ 目录布局优先解析,双份不一致记冲突; corrupt 来源显式失败而非当作 missing;consistent 要求 input/output/cache/USD 四字段全一致。
- #74:TB 幂等预留改为 per-key 排他 marker + fsync(16 并发恰一胜出);ledger 校验 fail closed, record 必须绑定 (candidate, task, attempt) 身份。
- #75 / #76:预算模型对样本与参数全域校验后fail-closed;Thompson 采样改为精确 Beta (Marsaglia–Tsang Gamma 组合),固定流确定性保留并刷新 scheduler golden。
- #77 / #81:Gate 6 用 SDK 规范
c_<base32>身份校验器替换 sha256 形状误用;runtime intent 按 kind 解析到冻结能力行,跨类替代 disable/unknown 一律拒绝,返回解析绑定供 admission。 - #86:proposal gateway 增加 maxConnections、idleTimeoutMs、requestTimeoutMs,超限主体即刻销毁。
- #92:sandbox 可执行 allowlist 先做组件级规范化(拒绝
./../空/NUL),再匹配规范化路径。 - #105 / #107:summary 复用须与 run-intent 及请求任务集完全对账,provider 不再把 caller 身份 盖到旧 evidence 上;trial 目录↔任务交叉绑定、attempt 唯一性、既有 sidecar 必须与计划身份一致。
- #118:V0.1.1 proposal 外层 acquire→try/finally 全程恢复 provider key;gateway 先关停后收据, 清理错误聚合不掩盖原异常;gateway 启动 chmod 失败自清理监听 server。
待合并 PR(CI 通过后 merge)
- PR #182(#61 续传保序)、PR #183(#55 原子成束)、PR #184(#71 staging 回收)。
明确未完成、保持 open(不构成任何验收声明)
- 大范围审计硬化族(#78 #79 #82 #83 #85 #87 #110 #111 #113 #114 #121 #125):共同前提是 把各 gate verifier 的输入从 caller 断言(hash 形状字符串/布尔)换成可信 object store 中 artifact 字节的重建与交叉绑定;需按 spec 06 统一设计 receipt schema 与 audit 重放,属多 PR 工程。
- #53 / #45 残余:proposal/build 路径尚未走 evaluation 同款 action saga(持久 intent→外部效果→ durable receipt);完成后 #45 的重复工作面随之闭合。
- Provider 传输(#57 AbortSignal 贯通、#123 重试计费对账)需协议层扩展(deadline/token 入封包) 并配套 gateway/adapter E2E。
- 架构级(#37 tsconfig 执行边界、#51 cgroup 配额、#65 构建期单一快照、#116 凭证与候选同进程) 需要 ADR(含容器/cgroup 拓扑与 DBUS/systemd-run 依赖决策)后方可实施;在 ADR 冻结前不动手。
以上未完成项的存在意味着当前仍不能声明这些攻击面已关闭;现有 v0.2 验收口径不变。
2026-08-27 第二批 issue 修复(本地门 + 独立 review + 合并)
GitHub Actions 新运行故障(startup_failure,无法重跑),本批全部改为本地全量门(build、单测、E2E、lint、typecheck)
- 独立 subagent review(对每个 PR 出具 APPROVE/REQUEST_CHANGES,blocker 修复后复审)后合并。所有评审发现的新问题均已立 issue。
已修复并合并(均带回归测试)
- #61(PR #182):Responses 工具续传保留完整会话(user/assistant 文本 → message item,cached items 就位交错);system-role fail-closed。
- #53/#45(PR #188):proposal/build 走
recoverExternalAction持久 saga(PLANNED→RESERVED durable intent →效果→ LAUNCHED→COMMITTED, 崩溃窗口按语义完成记录 reconcile-before-retry;状态门控写入;audit 接受终态 FAILED);realProposal 绑定 idempotency key 进证据束。 - #57(PR #189):gateway 传输贯通取消(envelope deadlineMs、client abort、socket close→host AbortController→provider fetch)。
- #123(PR #192):LLM 传输重试逐 attempt 记账(408/5xx ambiguous 分类、丢弃响应 usage 回收并入总额、receipt 携带 attempt 日志; review blocker——cache 双计——已修)。
- #72(PR #194):source identity 状态分级 SELF_CONSISTENT / COMMIT_ANCHORED / AUTHENTICATED(仅 archive 字节锚定可称认证), releaseFiles 精确清点,doctor 明示无外部锚。
- #114(PR #196):V011 求解器 overlay 注入经 admission 验证的 candidate digest(双 token 替换 + probe receipt 身份校验 + fail-closed)。
- #125(PR #199):finish_proposal 终端化并绑定验证字节 digest(mutating 工具拒绝、worker 出口复核、trusted 物化侧强制比对)。
- #110(PR #201,部分):Gate8 sealed/full 矩阵与 revealed/inventory 列表精确集合相等(按 review 建议保留 open:Merkle/清单认证属 #111 域)。
- #113(PR #202):invalid-replacement fixture 改为真实可复现负向动作(真实校验器拒绝 + digest 绑定 + audit 重放交叉验证)。
评审期间新立 issue(未解决,不宣称闭合)
issue #186(空白/不可序列化消息静默丢弃)、#187(Responses 续传无真实端点 E2E)、#190(生产未接线 deadline/signal;半关死客户端仅窗口兜底)、 issue #191(budget-stale-lock flaky)、#193(gateway 失败路径丢 attempt 日志)、#195(pruned 目录名清点盲区)、#197(probe 应加载真实打包 overlay)、 issue #198(V011 capsule c_id 与 controller digest 身份域在 collect 不相交)、#200(slot 元数据绑定 + worker 出口门负测试)、 issue #203(fixture 记录跨绑定 + schema 身份钉扎)。
仍开放(原有)
issue #37、#51、#65、#116(架构级,需 ADR);issue #56、#78、#79、#82、#83、#85、#87、#108、#111、#121(审计/验证器证据字节化族)。
验收口径不变:以上合并项均为工程加固,不构成任何 benchmark 提升或 sealed 结果声明。