FUTURE_STATEDIAGRAM.md

April 8, 2026 ยท View on GitHub

Hack23 Logo

๐Ÿ“ˆ Hack23 Homepage โ€” Future State Diagrams

Advanced State Management: Planned Enhancements
Future State Machine Documentation for hack23.com

Owner Version Status Review Cycle

License OpenSSF Scorecard

๐Ÿ“‹ Document Owner: CEO | ๐Ÿ“„ Version: 1.0 | ๐Ÿ“… Last Updated: 2026-02-20 (UTC) ๐Ÿ”„ Review Cycle: Quarterly | โฐ Next Review: 2026-05-20 ๐Ÿท๏ธ Classification: Public Low Standard


DocumentFocusDescription
๐Ÿ“ˆ State DiagramStatesCurrent state transitions
๐Ÿ“ˆ Future State DiagramRoadmapPlanned improvements (this document)
๐Ÿš€ Future ArchitectureArchitectureEvolution plans
๐Ÿš€ Future WorkflowsCI/CDPlanned workflow enhancements

๐ŸŽฏ Overview

This document outlines planned enhancements to the Hack23 homepage state management, including enhanced deployment states, translation lifecycle management, and advanced monitoring states.


๐Ÿš€ Enhanced Deployment States (Planned)

%%{init: {"theme": "base", "themeVariables": {"primaryColor": "#2196F3", "primaryTextColor": "#1a1a2e", "lineColor": "#455A64", "secondaryColor": "#e8f5e9", "tertiaryColor": "#fff8e1", "primaryBorderColor": "#1565C0"}}}%%
stateDiagram-v2
    [*] --> Idle: System Ready

    Idle --> Triggered: Push / Tag / Schedule

    Triggered --> Validating: Start Pipeline

    state Validating {
        [*] --> ContentValidation
        ContentValidation --> SecurityValidation
        SecurityValidation --> SRIValidation
        SRIValidation --> TranslationValidation
        TranslationValidation --> [*]
    }

    Validating --> Failed: Validation Error
    Validating --> Building: All Validated

    Failed --> Idle: Fix Required

    Building --> Attesting: Build Complete
    Attesting --> Deploying: SLSA Attestation Generated

    state Deploying {
        [*] --> PrimaryDeploy
        PrimaryDeploy --> ReplicaDeploy
        ReplicaDeploy --> CacheInvalidation
        CacheInvalidation --> [*]
    }

    Deploying --> PostVerification: Deploy Complete

    state PostVerification {
        [*] --> HealthCheck
        HealthCheck --> LighthouseAudit
        LighthouseAudit --> SecurityScan
        SecurityScan --> SRIVerification
        SRIVerification --> [*]
    }

    PostVerification --> Deployed: All Checks Pass
    PostVerification --> Rollback: Post-Deploy Failure

    Deployed --> Idle: Ready
    Rollback --> Idle: Previous Version Restored

    note right of Attesting
        SLSA Build Level 4
        Hermetic build
        Reproducible output
    end note

    note right of Deploying
        Multi-region deploy
        Primary: us-east-1
        Replica: eu-west-1
    end note

๐ŸŒ Translation Lifecycle States (Planned)

%%{init: {"theme": "base", "themeVariables": {"primaryColor": "#2196F3", "primaryTextColor": "#1a1a2e", "lineColor": "#455A64", "secondaryColor": "#e8f5e9", "tertiaryColor": "#fff8e1", "primaryBorderColor": "#1565C0"}}}%%
stateDiagram-v2
    [*] --> Current: Translation Complete

    Current --> Stale: Source Content Changed
    Stale --> Drafting: AI Generate Draft

    Drafting --> Review: Draft Generated
    Review --> Approved: Quality Score >= 0.85
    Review --> Revision: Quality Score < 0.85

    Revision --> Drafting: Revise Translation

    Approved --> Deployed: Auto-Deploy
    Deployed --> Current: Live on Site

    Current --> Obsolete: Page Removed
    Obsolete --> [*]

    note right of Stale
        Auto-detected when
        English source changes
        Flags all 13 languages
        variants for update
    end note

    note right of Review
        AI quality scoring
        Cultural accuracy check
        Terminology validation
    end note

๐Ÿ“Š Enhanced Monitoring States (Planned)

%%{init: {"theme": "base", "themeVariables": {"primaryColor": "#2196F3", "primaryTextColor": "#1a1a2e", "lineColor": "#455A64", "secondaryColor": "#e8f5e9", "tertiaryColor": "#fff8e1", "primaryBorderColor": "#1565C0"}}}%%
stateDiagram-v2
    [*] --> Monitoring: System Active

    Monitoring --> Normal: All Metrics Healthy
    Monitoring --> Warning: Metric Threshold Exceeded
    Monitoring --> Critical: Critical Metric Failed

    Normal --> Warning: Performance Degraded
    Warning --> Normal: Metric Recovered
    Warning --> Critical: Further Degradation

    Critical --> Investigating: Alert Triggered
    Investigating --> Remediating: Root Cause Found
    Remediating --> Normal: Fix Applied

    Critical --> Failover: Service Unavailable
    Failover --> DRActive: Route53 Failover
    DRActive --> Normal: Primary Restored

    note right of Normal
        Lighthouse > 90
        Availability > 99.9%
        No security alerts
    end note

    note right of DRActive
        GitHub Pages fallback
        Automatic DNS failover
        Alert team for recovery
    end note

๐Ÿ“‹ ISMS Compliance

Future state management enhancements align with: